-
triangulationalgorithms
基于MATLAB对两种三角化算法的分析 基于MATLAB对两种三角化算法的分析(MATLAB based on the analysis of two kinds of triangulation algorithmsMATLAB based on the analysis of two kinds of triangulation algorithms)
- 2013-11-18 10:23:07下载
- 积分:1
-
SAR_RD(matlab)
合成孔径雷达成像程序,使用RD算法,对点目标进行仿真,实现点目标的成像(Synthetic aperture radar imaging procedures, the use of CS algorithm, the point target simulation to achieve point target imaging)
- 2013-12-19 12:01:42下载
- 积分:1
-
splineroi
Matlab class that creates an interactive, closed spline which can be used as a region of interest. Can be used to select regions in an image
- 2009-12-06 12:48:15下载
- 积分:1
-
LFM_pc_MTI_MTD
雷达系统仿真分析,实现MTI,MTD脉压等各项操作(simulation of radar system)
- 2021-04-28 19:58:44下载
- 积分:1
-
各种遗传算法的程序%2C非常的全%2C非常的有效
遗传算法的matlab代码,用起来还不错,欢迎下载使用,谢谢各位。(The matlab code of genetic algorithm is pretty good to use. Welcome to download and use. Thank you.)
- 2018-04-06 18:56:56下载
- 积分:1
-
matlabexamples
matlab例题全部代码(all of matlab example code)
- 2007-08-20 18:13:57下载
- 积分:1
-
pca
PCA algorithm in matlab
- 2012-05-22 09:03:10下载
- 积分:1
-
Comparing-QPSK-and-BPSK
在MATLAB仿真环境下进行的QPSK和BPSK的性能仿真,内容较细致(QPSK and BPSK performance simulation in the MATLAB simulation environment, in greater detail)
- 2012-05-24 20:12:12下载
- 积分:1
-
dfp
本matlab程序用DFP法求解多元模型的最小值(给出初始点和精度要求条件)。(The matlab program using DFP method for solving the minimum multivariate model (given initial point and precision conditions).)
- 2014-01-16 17:06:14下载
- 积分:1
-
shuikuidiaodupso
说明: 水电站中长期优化调度主要是在满足电力系统出力要求以及下游综合用水要求等的前提下,合理地安排水库各个月份的发电流量,使得调度期内的总发电量最大。即在给定预报入库流量过程线、下游综合用水流量过程线、调度期起始水位和终止水位等条件下,通过总水量的合理运用使调度期内水电站的总发电量最大。(Long-term optimal operation of hydropower stations mainly in the power system to meet the output requirements, and integrated water requirements downstream of the premise, reasonable arrangements for generating reservoir flow each month, making the scheduling period, the largest amount of total power generation. That is forecast in a given inflow hydrograph, downstream water discharge hydrograph synthesis, scheduling and termination of the initial water level and water level conditions, the total amount of water through the rational use of the scheduling period, the total generating capacity of the largest hydropower station.)
- 2011-03-07 09:40:57下载
- 积分:1