-
MATLAB_Books_-_Ordinary_Partial_Differential_Equat
Matlab English version, simple and effective(Matlab english version, simple and effective)
- 2010-07-09 05:37:28下载
- 积分:1
-
MATLAB
Variational inference for Bayesian variable selection
- 2012-06-21 21:33:12下载
- 积分:1
-
kalmanfilter
Matlab code for Kalman filter
- 2013-09-27 02:23:14下载
- 积分:1
-
gray-theory
灰色理论matlab的使用范例,有文字说明,简单易用(Use of gray theory matlab example, text instructions, easy to use)
- 2013-04-07 21:02:50下载
- 积分:1
-
zhubuss
MATLAB逐步搜索法计算方程的根.
逐步搜索法也称试算法.它是求方程f(x)=0的根的近似值位置的一种常用的方法. 逐
步搜索法依赖于寻找连续函数)f(x)满足f(a)与f(b)异号的区间[a,b]一旦找到区间,无
论区间多大,通过某种方法总会找到一个根。(MATLAB root search method gradually equation
)
- 2013-12-22 16:24:57下载
- 积分:1
-
2
防雷工程是一项系统工程,要求将外部防雷装置和内部防雷装置统一考虑,着眼于全方位的雷电综合防护,把机房建筑物的防雷、雷电电磁脉冲(LEMP)防护、设备防雷、电源系统防雷、线路防雷、接地系统、保护装置等综合因素考虑在内。任何方面的遗漏带来的危害都是不能(Mine is a systems engineering project, requiring the external and internal lightning protection lightning protection devices to consider a unified, integrated focus on the full range of lightning protection, lightning protection of buildings to the engine room, lightning electromagnetic pulse (LEMP) protection, equipment, anti- Thunder, lightning protection power system, line lightning protection, grounding systems, protective devices and other comprehensive factors into account. Omission of any harm is not)
- 2010-10-21 16:20:45下载
- 积分:1
-
matlab4
阈值法区造程序,包括软阈值和硬阈值,还有软硬这种法去噪的程序(Threshold area making process, including the soft threshold and hard threshold, as well as soft and hard process of this method de-noising)
- 2010-05-21 09:25:14下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1
-
RICE-UNIVERSITY
标准压缩感知(CS)理论决定了可靠的信号恢复是可能给M= O(KLOG(N / K))的测量。我们证明了它可以通过利用超越简单的稀疏性和可压缩性由包括价值观和信号系数的位置之间的依赖关系更加逼真信号模型大大降低Mwithout牺牲的鲁棒性。(The standard compressive sensing (CS) theory dictates that robust signal recovery is possible from M=O(Klog(N/K)) measurements. We demonstrate that it is possible to substantially decrease Mwithout sacrificing robustness by leveraging more realistic signal models that go beyond simple sparsity and compressibility by including dependencies between values and locations of the signal coefficients.
)
- 2014-01-06 20:07:54下载
- 积分:1
-
power_entropy
基于从能量谱熵的角度出发识别不同调制方式的仿真程序(包括Am、Fsk、Fm、Pm、Ask、Fsk、radar signal)(Distinguish modulation method on power entropy)
- 2010-07-21 09:58:57下载
- 积分:1