登录
首页 » matlab » isolated land

isolated land

于 2019-05-16 发布
0 223
下载积分: 1 下载次数: 2

代码说明:

说明:  主动频率偏移法的改进,可以作为参考,只是需要一定的文献才能看懂(this s a typical method to solve the problem about the isolated land)

文件列表:

mali.slx, 25438 , 2019-05-15

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • ACATSP
    matlab用蚁群算法求解TSP问题的基本程序,初学者必看(TSP with ant colony algorithm matlab' s basic program, beginners must see)
    2011-05-29 19:03:12下载
    积分:1
  • theory-of--HHT
    关于HHT原理的详细叙述,文章阐述了HHT方法的实用性(HHT principle described in detail, the article explains the the HHT method of practicality)
    2013-04-19 22:14:21下载
    积分:1
  • gennnnee
    this file for gene finding using matlab very good for beginners
    2013-05-03 13:16:45下载
    积分:1
  • Time-Series-Forecast-With-Neural-Network-and-Wave
    Time Series Forecast With Neural Network and Wavelet Techniques
    2014-02-03 15:33:22下载
    积分:1
  • Order-Statistics-3rd[1]
    order static是在天线选择,用户选择中经常使用到的方法,这本书详细介绍了关于orderstatic的理论(order static in antenna selection, the user selects the method often used, this book details the theory on the orderstatic)
    2011-06-12 16:35:15下载
    积分:1
  • Lag_Newton
    用MATLAB编写的一个数值分析中,利用拉格朗日和牛顿迭代求解(a way of solving the method of larg and Newton)
    2010-01-24 17:01:17下载
    积分:1
  • BOT_SIR
    bearing only tarcking based sampleing importance resampling (SIR) filter(bearing only tarcking based sampleing The need ortance resampling (SIR) filter)
    2007-04-19 11:29:03下载
    积分:1
  • PI_Tuning_Example
    that is mdl file for tuning pi controller for dc machine.
    2014-08-22 18:03:44下载
    积分:1
  • Solutions_manual_for_modern_signal_processing-2nd
    This the solution manual for modern signal processing.
    2008-03-22 01:47:57下载
    积分:1
  • psb2machines_pss
    一1000 MW水电站(机组M1)通过一条500 kV, 700 km的输电线路与负载中心连接。负载中心模型是5000 MW的阻抗负载,由遥远的1000 MW电站和当地的5000 MW (机组 M2)电站供电。系统已经初始化,因此线路传送950 MW,接近它的潮流阻抗负载(SIL = 977 MW)。这两台机相当于一台水轮机和管理(HTG),励磁系统和电力系统稳定器(PSS)。这三个模块位于“涡轮和调速”子系统中。通过此例,在500 kV系统中制造故障,观察PSS对系统稳定性的影响。(a 1,000 MW hydropower station (crew M1) through a 500 kV, 700 km of transmission line and load center. Load center model is 5,000 MW of load impedance. from the distant 1000 MW power station and the local 5,000 MW (Unit M2) power supply. Is initialized, it transmits 950 MW. closer to its trend of load impedance (SIL = 977 MW). This machine is equivalent to a two hydraulic turbines and Management (HTG), excitation system and the power system stabilizer (PSS). This module is located at 3 "and turbine speed" subsystem. Through this cases, the 500 kV system manufacturing fault, PSS observation of the system stability.)
    2020-09-09 09:58:04下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载