登录
首页 » matlab » foster

foster

于 2021-04-27 发布 文件大小:23KB
0 281
下载积分: 1 下载次数: 15

代码说明:

  MMC中IGBT损耗计算与结温模块(计算开关周期内的损耗,公式可以参考 电工技术学报 WXP先生 2018-12-14 的一篇文献),还有一对VT+VD的Foster。公式及其实现没有问题,仿真过程可能出现代数环,如果有自己的Foster或者Cauer最好。(power loss calculation&junction temperature detection of IGBT in MMC)

文件列表:

foster.slx, 25087 , 2019-05-12

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • reverse
    reversing the numbers
    2009-10-18 02:39:14下载
    积分:1
  • matlab-optic
    本书介绍了matlab在光学方面的应用,很详细,给出了很详细的例子(This book describes the application of optical matlab, very detailed, very detailed examples are given)
    2010-11-17 09:35:23下载
    积分:1
  • modu_demodu
    matlab实现的调制以及解调过程,包括4QAM,8PSK,16QAM,64QAM(achieve Matlab modulation and demodulation of the process, including 4QAM, 8PSK, 16QAM, 64QAM)
    2007-02-04 15:32:46下载
    积分:1
  • MATLAB--GA-Toolbox
    matlab 遗传算法工具箱 GATBX (matlab genetic algorithm toolbox)
    2013-02-25 22:35:47下载
    积分:1
  • duandianjiance
    语音信号双门限法端点检测的matlab程序,用于语音信号的处理(Double threshold method of voice signal endpoint detection matlab program for speech signal processing)
    2015-01-13 16:56:07下载
    积分:1
  • TSP_PSO
    某一PSO算法优化TSP路径优化的问题,城市已经给定。(TSP scheme in a new version using some conventional PSO algorithm)
    2014-02-16 17:00:17下载
    积分:1
  • MoM_dipole_antenna
    矩量法matlab求对称阵子天线方向图,同时附有Hallen方程的解题思路(MoM dipole antenna)
    2015-04-22 18:32:35下载
    积分:1
  • chirp
    一个chirp信号,用来描述连续震动的正弦函数。(A chirp signal, which is used to describe the sine function of continuous vibration.)
    2013-10-22 16:32:51下载
    积分:1
  • Adaptive-Filters--10
    Adaptive Filters 10
    2013-05-20 21:48:19下载
    积分:1
  • shuxuejianmo_3
    说明:  某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
    2009-07-24 22:58:49下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载