登录
首页 » matlab » chirpedVI_PHASE_SHIFT

chirpedVI_PHASE_SHIFT

于 2015-03-18 发布 文件大小:1KB
0 181
下载积分: 1 下载次数: 4

代码说明:

  用vi传输矩阵法研究啁啾相移光栅的传输谱特性(Vi transfer matrix method using phase shift transmission study chirped grating spectral characteristics)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • fmid
    说明:  模糊建模工具箱,使用模糊聚类方法对系统进行辨识(Fuzzy modeling toolbox)
    2021-03-01 16:09:34下载
    积分:1
  • maichognyasuo
    通信工程与计算机方面的脉冲压缩的一些源代码通信工程与计算机方面的脉冲压缩的一些源代码(Communication engineering and computer aspects of pulse compression of some of the source code )
    2013-01-05 15:25:52下载
    积分:1
  • illumination-invariant-face-recognition
    The INFace (Illumination Normalization techniques for robust Face recognition) toolbox v2.0 is a collection of Matlab functions and scripts intended to help researchers working in the field of face recognition.
    2011-11-14 23:43:54下载
    积分:1
  • matlab-1
    cdma matlab codes working
    2012-05-20 16:10:25下载
    积分:1
  • sar-simulation
    星载SAR仿真 可以得到很好的成像效果,大家可以试一试(Simulation of spaceborne SAR imaging results can be very good, we can try)
    2021-03-30 15:59:10下载
    积分:1
  • program-matlab
    SIFT算法(尺度不变特征变换)Matlab 程序代码(SIFT algorithm (Scale Invariant Feature Transform) Matlab code)
    2011-11-19 19:55:09下载
    积分:1
  • 57765079motorvectorcontrol
    按转子磁链定向的矢量控制系统matlab仿真;(Press the rotor flux oriented vector control system matlab simulation )
    2013-11-17 20:13:38下载
    积分:1
  • pmsg-IGBT-RSC-GSC-chopper
    PMSG wind with fault ride through
    2015-06-05 22:45:27下载
    积分:1
  • nonlinear_dynamic_example_FDTD
    non linear simulation techniques for circuits FDTD
    2009-03-24 19:48:51下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载