-
20085251205996287
matlab神经网络源代码,非常有用的,请多多支持(matlab neural network source code, very useful, please support)
- 2009-02-25 12:08:34下载
- 积分:1
-
MATALBSTONE
本程序是关于MATALB图象处理应用例子,用MATLAB编程把图象石块的总个数计算出来。(This program is an example on the MATALB image processing applications, using MATLAB programming to the total number of images derived rocks.)
- 2010-12-28 17:11:44下载
- 积分:1
-
Fuzzy-Optimal-Control
Fuzzy Optimal Control for Multistage Fuzzy Systems
- 2013-11-13 15:03:35下载
- 积分:1
-
Matlab-Training-Basic
matlab在金融方面应用的内部培训,基础篇(internal training matlab applications in finance, Basics)
- 2014-05-20 18:57:33下载
- 积分:1
-
shotestpa
helpul code to finds the shortest path bounded
- 2010-09-29 18:16:23下载
- 积分:1
-
memory_test
MEMORY_TEST is a MATLAB program which declares and uses a sequence of larger and larger arrays, to see what the memory limits are on a given computer.The program tries an increasing series of values of N, using powers of 2, between limits that you set.
- 2011-12-02 05:52:31下载
- 积分:1
-
CircleFitByTaubin
基于Taubin论文方法的最小二乘圆拟合法
(Circle fit by Taubin
G. Taubin, "Estimation Of Planar Curves, Surfaces And Nonplanar Space Curves Defined By Implicit Equations, With Applications To Edge And Range Image Segmentation",IEEE Trans. PAMI, Vol. 13, pages 1115-1138, (1991))
- 2014-04-16 18:07:23下载
- 积分:1
-
gabor
gabor变换程序,初学,matlab,写的比较简单。供大家参考。(gabor transform procedures, beginner, matlab, written in relatively simple. For your reference.)
- 2007-09-10 17:24:46下载
- 积分:1
-
robut-control
this file contains a robust control project with report in word and mfiles
- 2013-07-26 16:21:55下载
- 积分:1
-
main
We formulate a scheduling problem that takes into account different hardware delays experienced by the secondary users
(SUs) in a centralized cognitive radio network (CRN) while switching to different frequency bands. We propose a polynomial-time
suboptimal algorithm to address our formulated scheduling problem. We evaluate the impact of varying switching delay, number of
frequencies, and number of SUs. Our simulation results indicate that our proposed algorithm is robust to changes in the hardware
spectrum switching delay and its performance is very close to its upper bound. We also compare our proposed method with the
corresponding constant switching delay-based algorithm and demonstrate that our suggestion of taking into account the different
hardware delays while switching to different frequency bands is essential for scheduling in CRNs.
- 2013-10-07 12:36:59下载
- 积分:1