-
MATLAB
algorithm for flat fading channel in wireless communication
- 2011-01-13 03:59:44下载
- 积分:1
-
luolunchixitong
在科学与工程计算中,用来模拟洛伦茨系统的程序。(Scientific and Engineering Computing, the procedure used to simulate the Lorenz system.)
- 2012-05-14 15:15:52下载
- 积分:1
-
thesis
simulink实现的HARQ的系统模型的搭建(simulink realization of HARQ system model structure)
- 2010-05-14 08:31:51下载
- 积分:1
-
1111EQ
说明: LMS自适应均衡仿真matlab例子特征值扩散度,步长参数的学习曲线仿真(LMS adaptive equalization Matlab simulation examples eigenvalue proliferation, a step learning curve parameters Simulation)
- 2006-03-26 14:05:02下载
- 积分:1
-
bpass
the program based on tracking for a new algorithm, Integrated Bayesian MCMC Model Selection MONTE CARLO that Ma Erkefu chain
- 2013-04-17 03:14:10下载
- 积分:1
-
literacy
基于matlab数字图像处理文字识别源文件(Based on digital image processing, character recognition matlab source file)
- 2009-12-13 17:25:01下载
- 积分:1
-
data-mining
数据挖掘 《机器学习与数据挖掘:方法与应用》,朱明等译,电子工业出版社(data mining conclude Classification,Estimation,Prediction,Affinity grouping or association rules,Clustering,Description and Visualization,Text, Web ,et al)
- 2011-05-02 18:42:05下载
- 积分:1
-
MATLAB
几种滤波器matalab的程序,非常实用,值得一看(matalab programmation)
- 2011-12-27 20:15:19下载
- 积分:1
-
continuous-signal-FFT
连续信号(可以自定义的函数)的FFT效果图,初学者学习的例程,不错(Continuous signal (can custom functions) of the FFT renderings, for beginners to learn the routine, good)
- 2013-12-13 13:32:49下载
- 积分:1
-
shuxuejianmo_1
说明: 某厂生产甲乙两种口味的饮料,每百箱甲饮料需用原料6千克,工人10名,可获利10万元 每百箱乙饮料需用原料5千克,工人20名,可获利9万元.今工厂共有原料60千克,工人150名,又由于其他条件所限甲饮料产量不超过8百箱.问如何安排生产计划,即两种饮料各生产多少使获利最大.进一步讨论:
1)若投资0.8万元可增加原料1千克,问应否作这项投资.
2)若每百箱甲饮料获利可增加1万元,问应否改变生产计划.
(Factory production of beverages and B in two flavors, each box 100 need a drink six kilograms of raw materials, workers 10 to 100,000 yuan profit B beverage cartons per cent five kilograms of raw materials needed, workers 20, the profitability of 90,000 yuan. this plant a total of 60 kilograms of raw materials, 150 workers, and because other conditions do not yield a beverage cartons more than 8 per cent. ask what arrangements the production of projects, namely the production of two the number of drinks to make the biggest profit. further discussion : 1) if the investment 08,000 yuan to increase one kilograms of raw materials and asked whether we should make this investment. 2) If a beverage cartons per cent profit increase 10,000 yuan and asked whether or not to change the production plan.)
- 2009-07-24 22:57:35下载
- 积分:1