-
Digital-Modulation
说明: 实现了频移键控 相移键控 幅度键控等多种数字调制的matlab仿真(The realization of the FSK keying phase shift keying, such as rate of a wide range of digital modulation matlab simulation)
- 2008-12-01 21:33:54下载
- 积分:1
-
ImageGrabberAsync
a image for async show
- 2011-11-13 18:37:14下载
- 积分:1
-
ImageEnhance
关于matlab图像增强的源代码,可以用在实际生活背景中,例如雾天模糊图像增强等等(Image enhance)
- 2014-08-25 11:57:39下载
- 积分:1
-
polysimu1
10-channel polyphase filter的simulink程序(10-channel polyphase filter the simulink program)
- 2007-10-10 10:01:19下载
- 积分:1
-
computer-control-technology
关于计算机控制技术的经典教材,温钢云、黄道平 编著,华南理工大学出版社,2001.8月出版。(Classic textbook on computer-controlled technology, temperature steel cloud, the ecliptic, South China University of Technology Press, 2001.8.)
- 2013-02-25 17:26:56下载
- 积分:1
-
fuzzy-torque-control
模糊转矩控制 本例采用模糊转矩控制效果较好(Torque fuzzy control in this case using fuzzy torque control is better)
- 2012-11-21 13:57:08下载
- 积分:1
-
pend
Engineering dynamics example using simulink and calculating the natural frequency of the system
- 2010-09-17 17:13:12下载
- 积分:1
-
AntSystem-WithPlay
使用matlab语言编写的程序,用于解决TSP问题(Use matlab language program used to solve TSP problems)
- 2009-12-28 10:01:56下载
- 积分:1
-
encoding-decoding
图像的编解码程序,可以直接运行,并含有PSNR的对比(The encoding and decoding files which can run without modify, and we have comparison of PSNR)
- 2014-01-04 15:23:45下载
- 积分:1
-
3zuoye
某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
- 2015-04-17 18:59:46下载
- 积分:1