登录
首页 » Visual C++ » subspace

subspace

于 2013-08-26 发布 文件大小:55KB
0 318
下载积分: 1 下载次数: 33

代码说明:

  经典子空间算法的完整实现,噪声消除效果比较好(an approach of speech enhancement algorithm)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • markov_localization
    Markov Localization.
    2015-02-19 18:21:27下载
    积分:1
  • VCformatlab
    说明:  在Visual C++中调用matlab中定义的函数,可以方便利用matlab的资源(Calling Matlab defined in the function, Matlab can facilitate the use of resources)
    2006-03-02 19:09:56下载
    积分:1
  • simulink
    全面、专业的介绍matlab中模块mulink模块的使用方法,列举的例题包含操作流程,非常实用。(Comprehensive, professional introduction matlab in Ostrava mulink modules to use, citing the examples include operating procedures, very practical.)
    2013-07-21 16:43:57下载
    积分:1
  • k-means
    k means 聚类聚类聚类聚类聚类聚类聚类聚类聚类(k means)
    2011-05-10 14:53:51下载
    积分:1
  • matlabcPP
    matlab c++对接matlab c++对接(matlab c++)
    2014-02-05 22:24:21下载
    积分:1
  • STLTestApp
    This application tests STL Library.
    2014-09-03 17:07:26下载
    积分:1
  • example1
    鱼群算法在多目标寻优问题上的应用,注释详细,代码初学者必备。(Fish swarm algorithm in multi-objective optimization problem, the application of detailed notes, code beginners.)
    2017-11-27 10:54:41下载
    积分:1
  • IPM-OPF
    程序用于求解电力系统最优潮流,采用原-对偶内点算法,并辅以文献,有利于对内点法的学习。(Procedures for solving optimal power flow, the use of primal- dual interior point algorithm, supplemented by literature, internal point of law in favor of learning.)
    2021-03-22 09:29:17下载
    积分:1
  • Mppt_sfunction
    可实现光伏电池板最大功率点的跟踪,使其输出最大功率(PV panels can achieve maximum power point tracking, so that the maximum power output)
    2011-05-24 16:01:32下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载