-
MATLAB3
还是工具箱 希望能够给大家提供帮助 呵呵 也希望站长批准我成为你们的会员 (This is the toolbox. Hope it can be helpful. Hope administrator can approve my willingness to be the member. Thanks.)
- 2005-08-04 10:15:12下载
- 积分:1
-
error_ellipse
说明: 本程序为误差椭圆matlab例程,工程应用(This procedure for the error ellipse matlab routines, engineering applications)
- 2009-08-10 17:00:55下载
- 积分:1
-
Adaboost
一个实现Adaboost训练和分类的matlab程序,带数据(Adaboost training and classification procedures, with data)
- 2013-08-19 17:15:35下载
- 积分:1
-
bpskber
BPSK在瑞利信道下的调制与解调,比较了两者的误码率,采用硬判决。(BPSK modulation in Ralay channel)
- 2013-04-18 21:00:56下载
- 积分:1
-
ec_matlab
应用nlms自适应滤波算法进行回声消除的matlab程序,很简单。(application nlms adaptive filtering algorithms eliminate echoes of Matlab procedures, is very simple.)
- 2006-10-16 11:22:39下载
- 积分:1
-
Kaiser-window-filter
Kaiser window filter programs
- 2012-11-03 13:06:05下载
- 积分:1
-
music_circle
圆阵列信号测向算法,圆阵列信号测向算法,(Circular array signal direction finding algorithm)
- 2021-04-18 22:08:51下载
- 积分:1
-
LDH
Program for Facrotization of a matriz by LDH
- 2012-10-18 09:56:17下载
- 积分:1
-
tafgukrt
matlab程序可以实现了数据从ZrUvOVA文件的输入,ar模型预测,arma模型预测,卡尔曼滤波器模型预测,利用图形用户界面编写 ,可以调节BnmSGYq环境,测试通过。 ( Matlab program can realize the data input a ZrUvOVA file. AR model prediction, ARMA model prediction and forecasting model Kalman filter using a graphical user interface written ZrUvOVAl environment can be adjusted, the test. )
- 2016-02-16 22:28:56下载
- 积分:1
-
shuxuejianmo_1
说明: 某厂生产甲乙两种口味的饮料,每百箱甲饮料需用原料6千克,工人10名,可获利10万元 每百箱乙饮料需用原料5千克,工人20名,可获利9万元.今工厂共有原料60千克,工人150名,又由于其他条件所限甲饮料产量不超过8百箱.问如何安排生产计划,即两种饮料各生产多少使获利最大.进一步讨论:
1)若投资0.8万元可增加原料1千克,问应否作这项投资.
2)若每百箱甲饮料获利可增加1万元,问应否改变生产计划.
(Factory production of beverages and B in two flavors, each box 100 need a drink six kilograms of raw materials, workers 10 to 100,000 yuan profit B beverage cartons per cent five kilograms of raw materials needed, workers 20, the profitability of 90,000 yuan. this plant a total of 60 kilograms of raw materials, 150 workers, and because other conditions do not yield a beverage cartons more than 8 per cent. ask what arrangements the production of projects, namely the production of two the number of drinks to make the biggest profit. further discussion : 1) if the investment 08,000 yuan to increase one kilograms of raw materials and asked whether we should make this investment. 2) If a beverage cartons per cent profit increase 10,000 yuan and asked whether or not to change the production plan.)
- 2009-07-24 22:57:35下载
- 积分:1