登录
首页 » matlab » esprit_ls

esprit_ls

于 2011-08-07 发布 文件大小:1KB
0 191
下载积分: 1 下载次数: 17

代码说明:

  LS ESPRIT for frequency estimation

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • New-WinRAR-archive
    matlab coding for personal communication in embedded system
    2013-01-10 22:03:36下载
    积分:1
  • image-enhancement
    该文档介绍了空域、频域图像增强的基本内容,并包含MATLAB程序(This document describes the spatial frequency domain image enhancement of the basic content and contains the MATLAB program)
    2014-09-15 17:10:20下载
    积分:1
  • Particle
    仿真实现了目标跟踪的粒子滤波跟踪,并对误差进行了统计( realize the particle filter)
    2011-09-30 15:12:50下载
    积分:1
  • fading
    Program to simulate Rayleigh fading using a p-th order autoregressive model AR(p) according to Baddour s work: Autoregressive modeling for fading channel simulation , IEEE Transaction on Wireless Communications, July 2005.
    2016-07-09 02:43:24下载
    积分:1
  • oqpskdemod
    这里有一个OQPSK的源代码,不错的,可以直接使用,需要的可以下载(There is a OQPSK the source code, well, you can directly use, in need can be downloaded)
    2007-10-24 20:14:51下载
    积分:1
  • matlab_touying
    MATLAB环境中使用投影法统计目标图像像素在每一行和每一列上的个数,然后画出统计图形。(MATLAB environment using the projection method the target image pixel statistics in each row and each column the number, and then draw statistical graphics.)
    2010-03-10 17:20:02下载
    积分:1
  • Linear_Regression_Program
    linear regression algorithm
    2009-12-10 21:39:38下载
    积分:1
  • tssf
    Script to simulate a digital full-state-feedback tracking system.
    2008-06-08 23:14:47下载
    积分:1
  • anttsp
    用蚁群算法解决TSP问题,其中有基本蚁群,蚁密系统,还有自己提出的改进算法,自带GUI界面。(TSP with ant colony algorithm to solve the problem, including the basic ant colony, ant density systems, as well as the improved algorithm itself, its own GUI interface.)
    2021-04-21 15:08:49下载
    积分:1
  • shuikuidiaodupso
    说明:  水电站中长期优化调度主要是在满足电力系统出力要求以及下游综合用水要求等的前提下,合理地安排水库各个月份的发电流量,使得调度期内的总发电量最大。即在给定预报入库流量过程线、下游综合用水流量过程线、调度期起始水位和终止水位等条件下,通过总水量的合理运用使调度期内水电站的总发电量最大。(Long-term optimal operation of hydropower stations mainly in the power system to meet the output requirements, and integrated water requirements downstream of the premise, reasonable arrangements for generating reservoir flow each month, making the scheduling period, the largest amount of total power generation. That is forecast in a given inflow hydrograph, downstream water discharge hydrograph synthesis, scheduling and termination of the initial water level and water level conditions, the total amount of water through the rational use of the scheduling period, the total generating capacity of the largest hydropower station.)
    2011-03-07 09:40:57下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载