-
LongestIncreasingSequence
找出数组A中最长的递增序列的长度,使用动态规划算法,复杂度为O(N*N)。(Find the longest increasing sequence)
- 2011-09-05 17:36:27下载
- 积分:1
-
migong---cPP
迷宫问题C++代码。。。解决迷宫问题。。。。(Maze C++ code. . . Solve maze problems. . . .)
- 2011-11-03 22:28:30下载
- 积分:1
-
yinhangjiasuanfa
一个很好的银行家算法,能运行(A good banker s algorithm, will be able to run)
- 2008-06-14 13:44:24下载
- 积分:1
-
huffman_tree_code
Huffman编码与译码,实现数据结构树的功能。(Huffman coding and decoding, data structure tree functions.)
- 2007-04-17 19:22:39下载
- 积分:1
-
StringClass
这个代码是STRING类的声明及实现,因为我认为C++类库中的string类比较庞大,找一个函数需要很长时间,所以用一个简单明了的代替之.(STRING kind of statement and realized, because I think the C library string of relatively large, a function for a very long time. Therefore, the use of a simple and straightforward replaced it.)
- 2006-05-17 17:46:58下载
- 积分:1
-
Fa_Pai
关于随机发牌算法的小程序,作为数据结构的大作业,开发环境是VC(Random licensing algorithm for small procedures, as big job data structures, the development environment is VC)
- 2014-10-16 17:54:20下载
- 积分:1
-
Josephus(data_struct)
数据结构中基于约瑟夫环问题,用C++方式实现的。。。。。(Data structure based on Josephus problem with C++ a manner. . . . .)
- 2013-11-17 11:30:24下载
- 积分:1
-
CR17_2014.05.19_list
数据结构线性表教学笔记,内容讲基础知识,没基础可以看看(Linear table data structure teaching notes, basic knowledge content says, no base can take a look)
- 2014-06-09 23:35:37下载
- 积分:1
-
BTree
排序二叉树(模板类),主要用于数据排序和查找。已在项目中使用(Sorted binary tree (template class), mainly used for data sorting and searching. Has been used in the project)
- 2010-10-09 13:49:44下载
- 积分:1
-
yuyundonghui
参加运动会的 个学校编号为 。比赛分成 个男子项目和 个女子项目,项目编号分别为 和 。由于各项目参加人数差别较大,有些项目取前五名,得分顺序为7,5,3,2,1;还有些项目只取前三名,得分顺序为5,3,2。写一个统计程序产生各种成绩单和得分报表。
2、要求产生各学校的成绩单,内容包括各校所取得的每项成绩的项目号、名次(成绩)、姓名和得分;产生团体总分报表,内容包括校号、男子团体总分、女子团体总分和团体总分。
3、测试数据:对于 , , ,编号为奇数的项目取前五名,编号为偶数的项目取前三名,设计一组实例数据。
(The school serial number participating in Games is. Competition divides into men s event and women s event , the project serial number parts for the sum. The difference is bigger since every project participates in a number , some projects choose the first five , score order is 7 , 5 , 3 , 2 , 1 Still have some of projects taking the first three places , score only being 5 , 3 , 2 in proper order. Write a form for report counting procedure producing the various school report card and score. 2, demands the school report card producing every school , content includes every achievement project number , position in a name list (achievement) , full name and score per got by school Produce the group total points form for report , content including the school number , male person group total points , woman group total points and group total points. 3, testing data: Be that the odd number project chooses the first five to the serial number, the serial number is that the even number project c)
- 2009-04-07 22:40:37下载
- 积分:1