登录
首页 » matlab » model_20100527

model_20100527

于 2011-05-23 发布 文件大小:21KB
0 283
下载积分: 1 下载次数: 327

代码说明:

  轻型直流输电系统仿真模型,用matlab中的simulink建模(Simulation model of HVDC light system)

文件列表:

model_20100527.mdl,241409,2010-06-03

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • 倒车
    设计一个模糊PID控制器,以及倒车系统simulink系统,使其可是实现对倒车系统的的优化控制。(Design a fuzzy PID controller, and the reversing system simulink system, so that it can achieve optimal control of the reversing system.)
    2021-04-11 13:38:58下载
    积分:1
  • KinematicSimulationofaRobotArm
    利用Matlab仿真工具,结合机械臂运动学特性,实现了机械臂系统的运动学仿真。(Using Matlab simulation tools, combined with the robot arm kinematics characteristics, realize the manipulator kinematics simulation system.)
    2008-03-23 12:02:12下载
    积分:1
  • wvd
    this is a good code for you.
    2011-12-12 20:03:28下载
    积分:1
  • h-k-means
    用MATLAB编写的层次-K-MEANS算法,简单实用,希望对您有帮助(Written using MATLAB level-K-MEANS algorithm is simple, practical, hope you find this helpful)
    2009-09-21 19:50:13下载
    积分:1
  • jacobi
    Use Jacobi algorithm to solve the linear equation
    2009-06-01 18:01:23下载
    积分:1
  • Simulink_Matlab--wind
    基于Simulink_Matlab的变速恒频风力发电系统控制与仿真研究(Based Simulink_Matlab VSCF Wind Power System Control and Simulation)
    2011-04-21 15:37:30下载
    积分:1
  • lorenz
    产生混沌时间序列,常用来测试算法函数逼近及预测能力的测试(Produce chaotic time series)
    2012-10-13 16:26:35下载
    积分:1
  • Digital-Signal-Processing-MATLAB
    “数字信号处理教程:MATLAB释义与实现程序 ”一书中的程序集(the code of Digital Signal Processing Tutorial: MATLAB interpretation and implementation of the program, dictionaries assembly )
    2015-01-26 17:03:18下载
    积分:1
  • date-calculate
    计算这一年已经逝去的天数(包括当天)。在平年中,它的取值范围为1到365,在闰年中,它的取值范围1到366。编写一个MATLAB程序,输入年,月,日,输出为对应的该天是当年的第几天。 闰年是这样规定的 1).能被400整除的年为闰年 2)能被100整除但不能被400整除的年不为闰年 3).能被4整除但不能被100整除年为闰年 4).其余的年份不为闰年 (This year has calculated the number of days elapsed (including that day). In non-leap year, it ranges from 1 to 365 in a leap year, it s the range of 1 to 366. Write a MATLAB program, enter the year, month, day, corresponding to the output of the first year of the day is a few days. This leap is required 1) is divisible by 400 is a leap year 2) can be divisible by 100 but not divisible by 400 years is not a leap year 3) be divisible by 4 but not divisible by 100 is a leap year 4) the rest of the year is not leap year)
    2011-12-13 23:35:17下载
    积分:1
  • dSPACE-implementation-of-Fuzzy-Logic
    dSPACE implementation of Fuzzy Logic based Vector Control of Induction Motor
    2015-03-30 13:51:07下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载