-
mimo_channel_estimation
MIMO-OFDM系统基于MMSE的信道估计算法,为了解MIMO-OFDM信道估计问题的提供一些入门帮助。(MMSE-based MIMO-OFDM system channel estimation algorithm for MIMO-OFDM understand the problem of channel estimation to provide some help getting started.)
- 2010-11-23 07:03:37下载
- 积分:1
-
mom
matlab程序,二维矩量法,无限长圆柱散射(matlab progress)
- 2012-04-16 20:58:21下载
- 积分:1
-
active-sliding-mode-control
基于滑模变结构控制的混沌系统的同步MATLAB源程序。(MATLAB source based on sliding mode variable structure control of chaotic system synchronization.)
- 2013-02-28 16:55:38下载
- 积分:1
-
Set-based-stochastic-optimization-for-evolving-in
Set-based stochastic optimization for evolving instinct-learning balance
- 2012-10-24 18:50:15下载
- 积分:1
-
03
说明: 基于kpca以及pca,pls,流形发的程序,应用于故障检测与故障诊断,还有故障识别,识别的效果很好,对象为cstr,程序简单(Based on kpca and pca, PLS, manifold hair of program, used in the fault detection and fault diagnosis, and fault recognition, identification of the good effect, the object for CSTR, procedure is simple
)
- 2011-12-26 10:25:46下载
- 积分:1
-
tm
说明: 用于计算二维正方格子金属光子晶体TM模禁带的(Lattice is used to calculate the two-dimensional metallic photonic crystal band gap of the TM mode)
- 2008-01-04 15:53:13下载
- 积分:1
-
erjiguanyingyong
文章介绍了二极管多种应用电路很实用的模电资料
(failed to translate)
- 2011-05-25 15:11:05下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1
-
Relay_routing
In March 2006 an IEEE task group was created to for incorporating mobile multihop relay capabilities in the mobile Wimax standard IEEE 802.16e. This group came up with an amendment to the 16e standard which is called 802.16j. This amendment is fully backward compatible. The addition of relay capability does not affect the design of MS unless MS has to exploit some optional features such as receive diversity. The BS needs to change slightly and is called MR-BS to differentiate it from BS with no MMR capabilities.
- 2011-10-23 22:28:14下载
- 积分:1
-
REFLCOEF
The Seismic Unix Project is partially supported by the CWP Consortium Project. In the past, the Seismic Unix Project has received partial support from the Gas Research Institute (GRI) and the Society of Exploration Geophysicists Foundation.
- 2011-11-11 09:20:14下载
- 积分:1