登录
首页 » matlab » 8

8

于 2011-04-29 发布 文件大小:8KB
0 198
下载积分: 1 下载次数: 0

代码说明:

说明:  例题全部代码. 薛定宇, 陈阳泉. 高等应用数学问题的Matlab求解.(All the code examples. Xue Dingyu, Chen Yangquan. MATLAB to solve higher applied mathematical problems.)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Calmettes_881
    un article de Calemetts contient Analysis of Non Ambiguous BOC Signal Acquisition Performance
    2010-06-17 00:47:20下载
    积分:1
  • WiBro-CTC
    wimax中的turbo码的实现,即CTC码,循环卷积turbo码(the achieve of the turbo in wimax)
    2009-04-03 13:44:33下载
    积分:1
  • Kalman
    这是一篇关于自适应卡尔曼滤波在目标跟踪系统中应用的学习文章,对学习卡尔曼滤波有很大的帮助(This is an article on adaptive Kalman filter target tracking system applied in the study article, to learn the Kalman filter is very helpful)
    2010-05-14 09:30:27下载
    积分:1
  • ex5FileIO-timePrandVal
    random number generator
    2015-01-16 09:12:23下载
    积分:1
  • 4
    灰色系统的matlab程序原代码,可用以对数据建立方程,进行预测(Gray system matlab program source code, the data used to establish equations to predict)
    2014-02-23 13:50:27下载
    积分:1
  • shuangmenxiananniu
    基于Matlab的语音端点检测实验研究的按钮设计(Matlab-based Speech Endpoint Detection Experimental Study on the button design)
    2008-04-18 15:57:41下载
    积分:1
  • MC
    说明:  matrix converter with induction motor
    2009-12-01 18:46:20下载
    积分:1
  • bintoCCK
    增加SCFDE系统的误码性能 改善SCFDE系统的误码性能(Increased SCFDE bit error rate performance of the system Improve the BER performance of SCFDE system )
    2012-06-11 21:47:03下载
    积分:1
  • KAuten_SS10
    matlab/stk联合开发,国外论文,有实例(matlab/stk joint development, International Paper, there are examples)
    2011-11-17 18:46:22下载
    积分:1
  • fuhefenpei-matlab
    发电公司一般不允许改变当天的电价投标,但可以改变机组的可用性.因此,在获得发电量之后如何组织机组进行发电,同时,又要保证成本低、效益高、收益大,是每个发电公司需要解决的问题,而行之有效的方法就是动态规划。(Power companies generally are not allowed to change the electricity price bidding, but can change the usability of the unit. Therefore, how to organize the unit after obtaining her capacity to generate power, at the same time, and to ensure that the low cost, high efficiency, large gains, is each generation company needs to solve the problem, and the effective method of dynamic planning.)
    2016-05-18 11:13:13下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载