登录
首页 » CHM » matlab_chinese_help

matlab_chinese_help

于 2009-07-12 发布 文件大小:1004KB
0 318
下载积分: 1 下载次数: 4

代码说明:

  此书是matlab的基础教程,讲解的比较详细,希望和网友分享(This book is the basis of matlab tutorials, more detailed explanations, hope and friends to share)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Folder-1
    i am an mtech student. i have to get simulink programs for my project.
    2012-02-08 17:50:12下载
    积分:1
  • lunwen
    用MATLAB实现一种快跳频通信系统毕业论文。Word版(Using MATLAB to achieve a fast frequency hopping communication system thesis. Word version)
    2011-05-26 18:09:17下载
    积分:1
  • Basic-ICA-code-
    ICA程序,1996提出的ica算法Basic ICA code in MATLAB (as used in Bell and Sejnowski 1996).(Basic ICA code)
    2011-10-18 19:53:52下载
    积分:1
  • vgxvarx
    VAR or VARX code for Matlab
    2015-01-28 14:35:11下载
    积分:1
  • New-folder
    Linear receiver stbc matlab codes
    2014-01-10 17:26:13下载
    积分:1
  • NRTL_2
    用NRTL模型,求解萘在一种离子液体中的活度系数。 求解非线性方程、非线性拟合都可以实现。 稍微对比了一下,发现还是拟合的结果好些。 Matlab源程序及结果在附件里(with NRTL model for naphthalene in an ionic liquid in the activity coefficient. Solve nonlinear equations, nonlinear fitting can be achieved. Contrast slightly for a moment and found that the fitting or better results. Matlab source and the results of the annex)
    2020-08-31 15:38:13下载
    积分:1
  • feeder-reconfiguration-for-DN
    通过MATLAB实现含分布式电源的配电网重构,可考虑多种类型负荷模式(MATLAB realization by containing distributed power distribution network reconfiguration, we can consider various types of load mode)
    2016-10-07 23:51:24下载
    积分:1
  • pls_2.1-0.tar
    做主成分回归和偏最小二乘回归,效果比较好,别人做的,我参与考了一下。(Master component regression and partial least-squares regression, the effect is better, someone else to do, and I participate in a bit test.)
    2007-10-24 21:25:16下载
    积分:1
  • shuxuejianmo_3
    说明:  某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
    2009-07-24 22:58:49下载
    积分:1
  • test2
    ecma-368 ultra wide band ber test2
    2013-01-13 05:23:47下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载