登录
首页 » Visual C++ » independentlyofMatlabprograms

independentlyofMatlabprograms

于 2010-01-16 发布 文件大小:78KB
0 209
下载积分: 1 下载次数: 14

代码说明:

  如何生成可独立运行的Matlab程序.介绍了Matlab C数学库、Matlab C++数学库、Matcom、Matlab COM Builder、Matlab Engine及编译Matlab独立可执行程序等Matlab混合程序设计的内容。 (How to build can be run independently of Matlab programs)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • ourdev_468573
    EM310ZILIAO,em310的资料,EM310ZILIAO,EM310ZILIAO,EM310ZILIAO,(GPRS INFOR)
    2009-12-23 13:14:30下载
    积分:1
  • beibaowenti
    背包问题遗传算法matlan主程序集合很有用(Knapsack problem genetic algorithm matlan main collection of useful)
    2011-04-22 14:25:20下载
    积分:1
  • unicode-001
    Based on ECMA 2 Draft 7 February 1999.
    2014-09-22 12:37:31下载
    积分:1
  • example-2.29-1.0.0.tar
    LIBRARY ZIGBEE WIRELESS SENSORS
    2010-02-09 22:36:39下载
    积分:1
  • monodevelopment_src
    Building applications with Mono
    2007-09-30 09:02:21下载
    积分:1
  • MccDemo
    一个VC与MATLAB混合编程的简单示例,需用到ibmatpm.lib libmmfile.lib libmcc.lib libmatlb.lib libmx.lib libmat.lib(VC++ and Matlab mix-program demo ,must include ibmatpm.lib libmmfile.lib libmcc.lib libmatlb.lib libmx.lib libmat.lib)
    2015-03-13 15:36:58下载
    积分:1
  • sanxiangsuo1
    matalab similink 单相锁相环 仿真建模(matalab similink singal PLL simulation)
    2012-11-11 16:39:33下载
    积分:1
  • ning2
    这是我做的第一个程序,希望大家支持下,谢谢,thank you(this is mine doing)
    2011-12-22 12:31:27下载
    积分:1
  • control_exp_missile
    制导律研究 制导律研究 制导律研究 制导律研究 制导律研究(Guidance Law Guidance Law Guidance Law Guidance Law Guidance Law)
    2015-05-26 23:15:29下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载