-
canny_edge_detector
Canny edge detection. It is an image processing algorithm for edg detection
- 2013-01-10 17:43:31下载
- 积分:1
-
New-folder-(2)
This program segment the tumor present in brain image. Sine brain symmetric about central axis brain is divided into 2 equal halves about the central axis.Histogram of both the part is taken. based on the histogram threshold is set.Result of segmentation is the segmented tumor.
- 2014-11-12 13:29:49下载
- 积分:1
-
MATLAB_huitu[1].doc
说明: matlab绘图与画图仿真方法与学习,一些实例,例子,课空(matlab simulation method of drawing and drawing and learning, a number of examples, examples, class space)
- 2010-04-16 21:22:50下载
- 积分:1
-
linear-system-analysis
线性系统状态空间分析(包括分析系统可控,可观性,对系统进行非奇异线性变换,分析系统稳定性,绘制阶跃响应曲线),极点配置(The state space of the linear system analysis (including analysis system controllability, observability, non-singular linear transformation of the system, the analysis of the stability of the system to draw step response curve), pole placement)
- 2012-11-25 16:05:24下载
- 积分:1
-
Lagrange1
说明: 已知n个自变量锁对应的函数值,可用该代码求出Lagrange唯一一个n阶差值多项式。(N independent variables are known to lock the corresponding function value, the code can be obtained only n-order differential Lagrange polynomial.)
- 2011-03-18 21:06:24下载
- 积分:1
-
sar_data_and_process
包含一个SAR数据,以及参考函数与成像的程序(contain sar-data and it s process program.)
- 2014-10-09 15:01:16下载
- 积分:1
-
ExpectationMaximization
Expectation Maximization
- 2010-01-15 22:50:55下载
- 积分:1
-
matlab.graphic
这是简单的一个可以绘制直线的matlab程序。这个程序只能绘制直线,圆等。程序简单,希望大家互相学习探讨。(this is a program about how to draw the line,the circle and so on.I hope we can learn the programe each other. thank you.)
- 2012-04-30 18:15:44下载
- 积分:1
-
ROC
I like it
When i say "ji"
you say "sus"
- 2012-11-06 22:30:21下载
- 积分:1
-
shuxuejianmo_3
说明: 某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
- 2009-07-24 22:58:49下载
- 积分:1