登录
首页 » matlab » example

example

于 2017-11-09 发布 文件大小:1KB
0 215
下载积分: 1 下载次数: 3

代码说明:

  一种多元一阶微分代数方程组的解法实例,通过实例进行讲解。大家可以看看(An example of solution to a class of multivariate first order differential algebraic equations)

文件列表:

robertsdae.m
SolveDifferentialAlgebraicEquationDAEExample.m

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • 神经网络剥皮
    神经系统的源码ea,供大家学习,借鉴,修改(Neural source code EA for everyone to learn, learn, modify)
    2020-06-30 21:00:02下载
    积分:1
  • win7vtdb
    开启VT调试,过某xxx游戏驱动保护工程源码(Open VT debugging)
    2021-03-10 21:09:26下载
    积分:1
  • WxpayAPI_php_v3
    微信支付php,官方demo,可以作为参考使用(WeChat pays PHP, official demo, which can be used as reference.)
    2020-11-23 15:39:33下载
    积分:1
  • This is the Digital Image Processing Guide, compared with dedicated systems, pdf...
    这是数字图像处理的教程,比较专用与系统,pdf格式-This is the Digital Image Processing Guide, compared with dedicated systems, pdf format
    2022-04-15 00:54:14下载
    积分:1
  • property
    计算燃气轮机燃气热物性,混合燃气的焓值、比热等参数(Calculating the thermal properties of gas turbine, enthalpy and specific heat of mixed gas)
    2019-04-26 15:00:53下载
    积分:1
  • 浸入边界法
    浸没边界法的论文,对于求解浸没边界法有帮助。(immersed boundary method paper,it is useful for coding immersed boundary method)
    2017-06-06 16:23:36下载
    积分:1
  • 苍穹倒计时源码
    说明:  倒计时美化源码非常漂亮的一款源码值得推荐啊(Countdown beautification source code very beautiful source code is worth recommending.)
    2020-09-17 21:47:27下载
    积分:1
  • COMPControlTIM
    STM32F051比较器与定时器实现逐周期电流控制(The STM32F051 comparator with timer periodic current control)
    2021-04-19 17:58:51下载
    积分:1
  • opengl
    Nehe的opengl全部教程,适用于c++语言,适合初学者。(All Nehe' s opengl tutorials for c++ language, suitable for beginners.)
    2014-05-05 17:28:47下载
    积分:1
  • 基于供电网格优化划分的中压配电网规划思路和方法
    提出了一套基于供电网格优化划分的中压配电网规划思路和方法。首先,确定规划区域主干通道布局,确保土地资源预留。然后,在明确网格划分目的和原则的基础上,基于就近选择负荷备供变电站和负荷聚类方法,实现供电网格在全局范围内的优化划分。最后,分别在各供电网格内,基于其供区分类优选接线模式和一、二次建设改造标准,并进行主干线布线规划。(This paper presents a set of ideas and methods for medium voltage distribution network planning based on power grid optimization. Firstly, the layout of the main corridors in the planning area is determined to ensure the reservation of land resources. Then, on the basis of defining the purpose and principle of grid partition, the optimal partition of power supply grid in the global scope is realized based on the near selection of load standby substation and load clustering method. Finally, in each power supply grid, based on the classification of supply areas, the optimal wiring mode and reconstruction standards of primary and secondary construction are selected, and the main wiring planning is carried out.)
    2020-06-19 06:40:01下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载