-
Digital Voltmeter
基于51单片机和8位ADC的数字电压表,可测量0-5V电压,程序用C语言编写。(Based on MCU and 8 bit AD C digital voltmeter, 0-5V voltage can be measured. The program is written in C language.)
- 2019-03-07 21:28:37下载
- 积分:1
-
利用C#语言与vs开发工具实现了一个,简单的桌面贪吃蛇游戏 frmGoodsReturn
利用C#语言与vs开发工具实现了一个,简单的桌面贪吃蛇游戏(A simple desktop snake-eating game is implemented by using C# language and vs development tools.)
- 2020-06-25 05:40:02下载
- 积分:1
-
BEBZ CECE
说明: photos or images of ceces bebz pictures
- 2019-06-18 14:35:19下载
- 积分:1
-
GNSS的BOC调制及其仿真
关于GNSS的BOC调制及其仿真的很好的文献(About GNSS BOC modulation and its simulation of good literature.)
- 2018-10-13 15:45:52下载
- 积分:1
-
BufferRing
说明: Buffer Ring Test application
- 2020-02-21 19:23:30下载
- 积分:1
-
用C语言实现的计算器.功能齐全,且实用,代码却不多
用C语言实现的计算器.功能齐全,且实用,代码却不多-using the C language calculators. Complete functions, and useful, but little code
- 2022-02-01 08:24:58下载
- 积分:1
-
FPGA电梯控制,是本人的课程设计,整篇报告格式上传
FPGA电梯控制,是本人的课程设计,整篇报告格式上传-FPGAdiantikongzhi,shibenrende1kechengsheji,zhengpianbaogaoshangchuan
- 2022-02-28 12:14:48下载
- 积分:1
-
jpg2mat
将文件名为编号1-99的图片补零,改文件名为001-099,方便图片读取。然后读取图像将图像转为.mat文件(Fill the file with the image numbered 1-99 and rename it 001-099 for easy reading.Then read the image and convert it to .mat file.)
- 2020-06-16 14:40:01下载
- 积分:1
-
各种PID控制算法的MATLAB源程序,可以结合相应的指导书学习
各种PID控制算法的MATLAB源程序,可以结合相应的指导书学习-various PID control algorithm MATLAB source, combining the corresponding study guide book
- 2022-11-01 03:50:03下载
- 积分:1
-
MPC of wind power cluster
说明: 该文基于模型预测控制理论, 提出一种考虑多时空尺度协调的风电集群有功分层预测控制方法。 该方法将风电集群在空间尺度上分为三层控制层,将超短期风电功率预测值在时间尺度上逐层细化,并对各层滚动优化环节进行了优化建模。 仿真分析中通过与常用有功分配方法对比, 结果表明文中所提方法在保证系统安全运行和满足集群计划的同时,能够提高风电消纳能力,合理利用风能资源和分配集群内风电功率。(Based on the model predictive control theory, this paper proposes a wind power cluster active layered predictive control method that considers multi-temporal scale coordination. The method divides the wind power cluster into three layers on the spatial scale, and predicts the ultra-short-term wind power prediction value on a time scale, and optimizes the rolling optimization of each layer. Compared with the commonly used active power allocation method in the simulation analysis, the results show that the proposed method can improve the wind power consumption capacity, rationally utilize the wind energy resources and allocate the wind power in the cluster while ensuring the safe operation of the system and meeting the cluster plan.)
- 2020-06-18 22:00:01下载
- 积分:1