-
cz
说明: 数学建模在的插值问题的求解,主要用于解决测量问题,如水道测量(Mathematical modeling in solving the problem of interpolation, is mainly used to solve measurement problems, such as water measurement Road)
- 2009-05-17 19:52:37下载
- 积分:1
-
MOEA
一篇带约束条件的基于多播QOS多目标算法的论文。(Constraints QoS Multicast Routing Based on MOEA)
- 2011-05-14 18:53:41下载
- 积分:1
-
biaokuai
利用c++编程,该程序实现了不使用标准块输入访问simulink信号(Using c++ programming, the program achieved without the use of standard access simulink block input signal
)
- 2014-12-14 15:30:33下载
- 积分:1
-
cpso
根据cpso算法给出的一个matlab代码,全,添加测试函数即可运行(According cpso given an algorithm matlab code, full, add test functions to run)
- 2014-01-21 10:28:01下载
- 积分:1
-
NNPID
基于PID控制的神经网络控制算法,智能控制课堂作业(PID control based on neural network control algorithms, intelligent control of the classroom work)
- 2010-05-06 15:40:02下载
- 积分:1
-
cand
说明: 数学建模,正态性检验MATLAB程序,经检验,很好,很牛逼!(Mathematical modeling, MATLAB test normal procedures, by inspection, very good, very牛逼!)
- 2009-08-15 16:24:54下载
- 积分:1
-
wKA
ωKA是实现SAR图像成像的一种方法,该程序实现了ωKA的近似和精确两种成像方式,仿真参数参考《合成孔径雷达成像——算法与实现》,利用Stolt插值实现了目标成像,最后在方位向和距离向进行切片,观察成像结果。(ωKA is one of the point target imaging algorithms of SAR . This program implements both exact and approximate ways of imaging. Simulation parameters refer to the book Synthetic Aperture Radar imaging- Algorithms and Implementation .)
- 2021-03-12 15:49:25下载
- 积分:1
-
symbolrate_estimation_cycle_MFSK
波特率估计算法,盲信号处里当中很重要的参数估计方法,本算法适合MFSK的波特率估计(estimation of baudrate)
- 2013-11-08 22:48:54下载
- 积分:1
-
FIR_band_pass-and-iir-low-pass
这个是对于fir带通滤波器以及iir低通滤波器的一个仿真。程序代码通俗易懂,意义很大。(This is a band-pass filter and the fir iir low-pass filter with a simulation. Program code easy to understand, very meaningful.)
- 2013-09-03 15:59:39下载
- 积分:1
-
pipe
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
- 2008-07-07 10:25:25下载
- 积分:1