-
SJGC
matlab仿真,随机过程,泊松过程产生级仿真过程。(this is soft simulink and use matlab,so we can learn possion process and its how to produce.matlab is powerful soft for it.)
- 2011-12-13 20:38:18下载
- 积分:1
-
d2conv
二维信号卷积,若x为N1*M1的二维信号,y为N2*M2的二维信号,则卷积为(N1+N2-1)*(M1+M2-1)的信号(Two demension signal convolution. )
- 2014-08-21 12:41:40下载
- 积分:1
-
VC中调用MATLAB示例代码
VC中调用MATLAB示例代码(VC Calling MATLAB sample code)
- 2005-03-12 09:34:38下载
- 积分:1
-
213MatlabPC
非常有名的捕食者算法Matlab+C 可进行目标定位(Very well-known predator algorithms
Matlab+C)
- 2012-04-02 17:20:57下载
- 积分:1
-
SourceCodeWM4e
Data Abstraction & Problem Solving with C++源码(Data Abstraction )
- 2007-10-23 16:20:53下载
- 积分:1
-
MATLAB
Normalized Cut Image Segmentation Code (Normalized Cut Image Segmentation Code)
- 2008-05-05 11:10:38下载
- 积分:1
-
1
说明: 利用直接替换法进行缓冲区溢出的相关检测的几个c++程序。(Related buffer overflow detection method using a direct replacement for a few c++ program.)
- 2014-11-25 14:55:56下载
- 积分:1
-
ANT_AN04_Burst_Transfers
ANT协议中的burst数据传输方式详解,包括收发时序及数据格式。(ANT protocol Detailed burst data transmission, including the timing and receive data format.)
- 2014-01-12 10:07:36下载
- 积分:1
-
SCM
通过设置不同的参数利用Matlab软件仿真了不同场景下的系统性能
(This document suggests a user’s guide to a MATLAB application which simulates a Spatial Channel Model (SCM) based on reference [1] with some minor adjustments. It focuses on how to use the Graphical User Interfaces (GUIs) and the functions of the application and avoids going into specifics about the nature of the parameters as this is done analytically in the reference document)
- 2013-09-05 15:03:49下载
- 积分:1
-
pipe
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
- 2008-07-07 10:25:25下载
- 积分:1