-
POJ2371
PKU ONLINEJUDGE 2371
- 2011-10-21 15:03:03下载
- 积分:1
-
Well-tested-algorithm
效验算法单循环链表,这些都是实用经典的算法和数据结构(Well-tested algorithm round robin list, these are practical classic algorithms and data structures)
- 2011-08-02 12:20:21下载
- 积分:1
-
FreeTree
无环连通图G=(V, E)亦称为自由树T,其直径是树中所有顶点之间最短路径的最大值,设计一个算法求T的直径(Acyclic connected graph G = (V, E) is also known as free tree T, whose diameter is the tree of shortest paths between all vertices maximum design an algorithm for the diameter of T)
- 2013-10-29 16:31:47下载
- 积分:1
-
radixsort
对首先产生20个随机数进行基数排序,是利用C++实现的(On the first 20 random numbers generated for the base sequencing is the use of C++ Realize the)
- 2007-10-16 19:11:53下载
- 积分:1
-
list-and-array
数组的定义与使用,数组的运算,字符串的输入与输出,冒泡排序(list and array)
- 2013-10-17 11:32:30下载
- 积分:1
-
Figure-topological-sort
说明: 拓扑排序
对一个 有向无环图 G进行拓扑排序,是将G中所有顶点排成一个线性序列,使得图中任
意一对顶点u和v,若u,v ∈E,则u在线性序列中出现在v之前。
通常,这样的线性序列称为满足拓扑次序的序列,简称 拓扑序列 。
注意:
①若将图中顶点按拓扑次序排成一行,则图中所有的有向边均是从左指向右的。
②若图中存在有向环,则不可能使顶点满足拓扑次序。
③一个DAG的拓扑序列通常表示某种方案切实可行。 (Topological sort
In a directed acyclic graph G topological sort, is all vertices will G formed a linear sequence, make diagram post
Meaning a pair of vertex u and v, if u, v ∈ E, then u in linear sequence in which they appear in v before.
Usually, such linear sequence sequence of topological order called meet, abbreviation topology sequence.
Note:
(1) if the diagram according to the topology order line vertices, then figure all from left to right edge are pointing.
(2) if the figure to exist in the ring, is impossible to have the vertex meet topological sequence.
(3) a DAG topological sequence usually expressed some scheme is feasible.
)
- 2011-03-22 17:19:14下载
- 积分:1
-
point
用分治算法(O(nlogn)复杂度)实现寻找n个点中最邻近点对,输出为最邻近距离的平方(Looking for n points nearest point, the output of the nearest neighbor distance squared using the divide-and-conquer algorithm (O (nlogn) complexity))
- 2012-12-16 13:14:04下载
- 积分:1
-
jiaotong
用于课程设计 利用Dijkstra算法进行简单的最短路径查询 (For curriculum design simple shortest path query)
- 2013-03-23 13:06:49下载
- 积分:1
-
Prim
编程实现Prim算法,基于最小堆数据结构,生成最小代价生成树。
(其中随机生成点和边,形成连通图)
根据输入的顶点数的不同,分析时间复杂度。(Implement Prim’s algorithms based on min-heap and disjoint set data structure for constructing a minimum cost spanning tree.
Generate weighted undirected complete graph for given size n according to the following approach:
1) Randomly generate n points ( ) on a plane
2) Randomly generate k pairs of points as edges of the graph.
3) The weight of an edge of the graph is defined as the the Euclidean distance between two endpoints of the edge.
)
- 2011-06-11 16:28:53下载
- 积分:1
-
houzixuandaiwang
猴子选大王是个重要问题猴子选大王是个重要问题猴子选大王是个重要问题(houzixuandawang)
- 2009-05-05 17:00:13下载
- 积分:1