-
Sobel-Edge-Dectector
sobel vi in labview.this might help or give some basic idea about it.
- 2011-09-13 00:19:04下载
- 积分:1
-
dingcan
用户分为普通用户和管理员
普通用户只有订餐、发送订单、修改个人信息的权利
管理员拥有普通用户的所有权利 以及增删改查的权利、对货物的增删改查
对订单的查看、删除、处理等、以及对用户的管理
(Users are divided into ordinary users and administrators ordinary users only ordering, send orders, the right to modify personal information Administrators have all the rights of the ordinary users as well as the right to CRUD the CRUD check goods orders view, delete, processing etc., as well as the management of the user' s)
- 2013-02-27 12:05:50下载
- 积分:1
-
double-input-z-source
double in pu z source inverter amterea
- 2012-07-01 14:18:26下载
- 积分:1
-
detecting-buildings-and-roads-
用来提取建筑物的一些设置,使用eCognition软件进行建筑物提取的方法和步骤(The methods and procedures used to extract some of the buildings set eCognition software for building extraction)
- 2012-10-29 16:47:44下载
- 积分:1
-
铝型材锯切控制程序
说明: PLC control program, automatic cutting production line for aluminium profile
- 2019-05-27 11:23:51下载
- 积分:1
-
DesignofAOpticalSpectrometerBasedonLabVIEW
说明: 利用虚拟仪器开发软件LabVIEW 设计了一台光谱仪,使用CCD 一次接收整个光谱,同
时利用LabVIEW 高度集成化的模块进行显示、分析等处理,效率高,开发周期短,仪器使用方便,功能多且易于扩展1(Design of A Optical Spectrometer Based on LabVIEW)
- 2009-08-27 15:35:09下载
- 积分:1
-
ADI-FDTD(LU)
This is the program for 2D ADI FDTD method introduced by Namiki. This works fine with non-uniform cell, but for uniform cells, the program is not correct.
- 2020-06-29 15:40:02下载
- 积分:1
-
TheDesignof35kVGridRelayprotection
本压缩包 包含 任务书、论文以及答辩ppt,虽说是课程设计,但是按照毕业设计书写,内容充实
本次课程设计主要是对象湖变的电网进行保护整定,对d1至d6共6个地方进行了最大方式与最小方式运行情况下的短路电流计算。计算完短路电流后,对L1至L5共5条线路进行电流保护整定。但是由于线路较短,线路阻抗较小。经计算后均不适合三段式电流保护。所以采取了纵联差动保护作为主保护,定时限过电流保护作为后备保护。对于变压器,采用纵联差动保护与气体保护共同作为主保护,过负荷保护作为后备保护。(The curriculum design is the object variable grid lake protection setting of D1 to D6, 6 places for the maximum and minimum operation mode under the condition of short-circuit current calculation. Calculation of short-circuit current after the end, L1 to L5 a total of 5 lines of current protection setting. But because of shorter lines, line impedance is small. The calculations are not suitable for three phase current protection. So take a longitudinal differential protection as the main protection, timing and limiting current protection as a back-up protection. For transformers, using longitudinal differential protection and gas protection as the main protection, overload protection as a back-up protection.)
- 2012-03-06 16:26:36下载
- 积分:1
-
power-PMSG
Power flow control of PMSG
- 2015-08-12 17:10:25下载
- 积分:1
-
calc
ASM Code for calculator using AVR
- 2011-12-05 11:34:26下载
- 积分:1