登录
首页 » Java » Sales-Point

Sales-Point

于 2015-02-18 发布 文件大小:353KB
0 194
下载积分: 1 下载次数: 1

代码说明:

  Sales point application that contain 6 source codes files

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • interior-method
    说明:  内点法的机组组合程序,采用不可行内点启动的原对偶线性规划内点法,采用了稀疏技术(unit commitment program using interior method)
    2011-04-05 08:10:36下载
    积分:1
  • Reg_courant_PMW
    Controle de courant avec PMW
    2012-04-04 02:04:10下载
    积分:1
  • Binary-coding
    二进制编码连续函数遗传算法二进制编码连续函数遗传算法二进制编码连续函数遗传算法(Binary coding genetic algorithm continuous functions)
    2011-09-16 16:20:53下载
    积分:1
  • fiber-mode-LP01
    利用matlab实现光纤的模式分布图的模拟。(Using matlab to achieve mode fiber distribution simulations.)
    2020-12-07 16:49:22下载
    积分:1
  • gridding.tar
    This is a work-in-progress. Please check back for updates, and check software carefully before using!
    2014-10-14 13:20:25下载
    积分:1
  • VarSelection
    Matlab code for Variable Selection
    2012-09-21 20:22:42下载
    积分:1
  • smooth
    this matlab code describes smoothing filter
    2010-10-04 18:24:42下载
    积分:1
  • GUI_1
    matlab 读取操作图片,可以打开图片,改变其显示模式(matlab read operation picture, you can open the picture, and changing the display mode)
    2009-05-13 16:38:10下载
    积分:1
  • Heavy-automotive-interior
    重型汽车车内声压级预测与主要噪声源分析 中国重型汽车正成为中国汽车产业在国际市场上最具竞争力的强势产业,但 目前国产重型汽车的 NVH(Noise,Vibration and Harshness)性能和国际先进水平 之间仍存在一定的差距。 (Heavy automotive interior SPL prediction and analysis of the major sources of noise China National Heavy Duty Truck is becoming China s auto industry the most competitive in the international market a strong industry, but At present, the domestic heavy-duty vehicles of NVH (Noise, Vibration and Harshness) performance and the international advanced level There is still a gap between.)
    2014-10-30 15:59:25下载
    积分:1
  • the_min_cost
    本程序用来求有向网络中的最大流和最小费用的问题。这里最小费用是在可能有多个最大流的基础上优化得到的。故前提条件是最大流,如果没有没有最大流,可以不运输,成本为0,那就没有意义了。(This program used to beg for the maximum flow to the network and the minimum cost. Here is the minimum cost in May have multiple maximum flow based on optimization get. So premise condition is maximum flow, if no no maximum flow, can not transport, the cost of 0, that is no sense. )
    2010-12-03 19:41:13下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载