登录
首页 » matlab » Candide3

Candide3

于 2010-07-26 发布 文件大小:139KB
0 266
下载积分: 1 下载次数: 120

代码说明:

  Candide-3 face model

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • IEEE80211n_settings
    wifi ieee 802.11n parameter programme
    2010-06-08 22:33:46下载
    积分:1
  • trail6666
    MODULATION AND DEMODULATION WITH NOISE AND AGAIN EXTRACTING IT FROM THE SIGNAL
    2010-11-24 09:46:48下载
    积分:1
  • IPToolbox
    说明:  这是一个国外的DST的Matlab工具箱,很全面的反映了dempster-shafer理论,是学习DST的权威工具箱(This is a foreign DST toolbox of Matlab, it is a comprehensive reflection of dempster-shafer theory, is to learn from the authority of DST Toolbox)
    2008-09-22 16:51:23下载
    积分:1
  • xiaobo1
    说明:  图像的小波分解,然后进行压缩,以及最终的恢复图像(Wavelet image compression recovery)
    2010-04-25 14:00:16下载
    积分:1
  • PSO-alg
    particle swarm optimization
    2011-11-23 16:12:46下载
    积分:1
  • gui3
    视频质料 在matlab环境中如何使用radiobutton,switch语句,边缘检测(Video material in the matlab environment how to use radiobutton, switch statement, edge detection)
    2009-05-11 17:22:42下载
    积分:1
  • Dynamic-simulation-of-micro-grids
    说明:  基于电力电子的微网的动态仿真,希望对大家有用(Dynamic simulation of power electronics dominated micro-grids)
    2011-04-17 19:22:42下载
    积分:1
  • matlab
    matlab的简明实例教程,可以自己研究一下 还不错的教程(concise instance of matlab tutorials, you can look pretty good your tutorials)
    2010-05-22 02:07:58下载
    积分:1
  • GUNESHUCREMAKALE
    solar cell photovoltaik pv mat lab bir diyodlu model m-file
    2013-01-14 02:44:50下载
    积分:1
  • moxingyuece3
    高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
    2014-01-10 17:30:42下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载