登录
首页 » MathCAD » julei

julei

于 2012-09-06 发布 文件大小:111KB
0 171
下载积分: 1 下载次数: 5

代码说明:

  matlab与聚类分析的结合,用matlab解决聚类分析问题,适用于初学者 (matlab combination of cluster analysis, cluster analysis matlab solve problems, suitable for beginners)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • LSPE
    提供了几种最小二乘法程序包括:批处理最小二乘参数估计,递推最小二乘参数估计,遗忘因子递推最小二乘参数估计,递推增广最小二乘参数估计。(Provides several least squares procedures include: Batch least squares parameter estimation, recursive least squares parameter estimation, forgetting factor recursive least squares parameter estimation, Recursive Extended Least Squares Parameter Estimation.)
    2013-08-27 19:37:54下载
    积分:1
  • dcmot0
    Transient running operation of Dc Machine.
    2012-10-15 13:05:42下载
    积分:1
  • UPF
    说明:  可以用这份代码做粒子滤波,效果还行,这个是无迹的算法(This code can be used for particle filtering.)
    2021-03-19 20:09:18下载
    积分:1
  • pre
    一篇MATLAB环境下的语音识别系统的文章( the article is a speech recognition system in MATLAB environment )
    2009-11-07 17:40:08下载
    积分:1
  • matlab-Instruction-List
    介绍matlab的腐蚀,膨胀,开运算,闭运算,细化,去噪等的指令,对于初学者非常有用。(Introduction matlab corrosion, expansion, opening operation and closing operation, refinement, noise and other instructions, very useful for beginners.)
    2011-05-23 23:17:06下载
    积分:1
  • chap5_4s
    智能控制的应用2 基于模糊控制的控制器仿真 简单易懂 功能强大(intelligent control of two based on fuzzy controller to control the simulation is simple to understand the powerful)
    2007-05-31 17:21:41下载
    积分:1
  • Impulse-response
    it is a program for determining and plotting impulse response
    2014-09-08 03:07:08下载
    积分:1
  • guassianfilter
    this code emploid gossian filter on a image
    2010-08-30 23:22:44下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 2003NN
    重压缩检测:检测图像是否存在两次JPEG压缩并定位篡改区域(double JPEG detection)
    2021-04-02 21:59:07下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载