登录
首页 » matlab » hough

hough

于 2013-03-21 发布 文件大小:1KB
0 209
下载积分: 1 下载次数: 16

代码说明:

  利用霍夫变换原理求解圆环的圆心,以及半径(The Hough transform principle solving Rings center of the circle, as well as the radius)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • 时滞系统的PID控制
    上传代码是时滞PID控制系统的simulink仿真,已经验证过。(The upload code is Simulink simulation of time delay PID control system, and has been verified.)
    2021-05-08 13:48:35下载
    积分:1
  • The-Quake-III-Arena-Bot
    The-Quake-III-Arena-Bot AI
    2013-03-12 14:21:07下载
    积分:1
  • blind-source
    盲源分离程序,可用于音频混合的分类 该程序为写为matlab一函数(blind source separate)
    2011-12-07 11:20:29下载
    积分:1
  • Encoder
    used to encrypt the input image using RAS algorithm
    2012-11-25 22:32:07下载
    积分:1
  • Image-compression
    This is the project is image compression based dwt algorithm
    2015-04-21 15:59:29下载
    积分:1
  • PsoProcess_Micro_Grid
    在假设负荷预测、风机和光伏未来出力已完全准确的情况下(允许弃风弃光),采用改进PSO算法对某含有风机、光伏、以及常规负荷的微电网未来24 小时的出力调控进行日前优化,以实现经济性最优(Under the assumption that the load forecasting, the wind turbine and the future power of the photovoltaic power are completely accurate (allowing for abandonment of the wind and light), the improved PSO algorithm is used to optimize the output of a microgrid containing the fan, photovoltaic, and conventional load for the next 24 hours in order to achieve the optimal economy.)
    2020-12-22 22:09:07下载
    积分:1
  • AR_MATLAB
    说明:  AR模型的源程序。(AR model of the source.)
    2006-05-06 20:57:07下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • BSS
    盲源分离;求峭度;可以把混合信号分离出来,并且可以比较前后分离信号的峭度(Blind source separation seek kurtosis can separate the mixed signal, and the signal can be compared before and after the separation of kurtosis)
    2013-11-08 16:21:08下载
    积分:1
  • Code
    清华大学王书宁老师凸优化课程原对偶内点法求解二次规划问题(code using primal dual interior point method to solve the problem of quadratic programming in convex optimization class by Shuning Wang, Tsinghua univ.)
    2021-03-22 09:29:17下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载