-
secondwave
用二代小波实现加噪信号的消噪 本次分解只做三层 可以根据需要增加次数(second wave)
- 2011-05-06 20:47:42下载
- 积分:1
-
matlab3
图象分析,灰度调整,图象过滤等实用的MATLAB程序(image analysis, gray scale, image filtering, and practical procedures for MATLAB)
- 2006-07-10 12:45:03下载
- 积分:1
-
msk1
msk的调制和解调程序,并给出了误码率和频谱分析结果。(the modulation and demodulation of msk.)
- 2014-10-09 19:17:13下载
- 积分:1
-
NeuralNetwork_BP_Classification
用matlab实现了人工神经网络的Bp网络算法,有利于图形图像的提取和识别(Matlab achieved using artificial neural network algorithm Bp network is conducive to graphical image extraction and recognition)
- 2008-07-21 16:13:59下载
- 积分:1
-
matlabgaojiepugongjuxiang
说明: matlab高阶谱分析工具箱,用于高阶谱的分析(very usefull )
- 2010-05-04 16:38:32下载
- 积分:1
-
re1
The model used for creating the reference voltage is shown
in Fig. 4. First, photovoltaic output current (Ipv) and output
voltage (Vpv) are passed through a first order low pass filter
with a magnitude of G = 1 and a time constant of T = 0.01
seconds in order to filter out the high frequency components
or harmonics from these signals as shown in Fig. 5 and Fig. 6.
The filtered current and voltage signals (Ipv_F and Vpv_F) are
then fed into the MPPT control block that uses the Incremental
Conductance Tracking Algorithm. An algorithm that is based
on the fact the slope of the PV array power curve shown in
Fig. 7 is zero at the Maximum Power Point (MPP), positive on
the left of the MPP, and negative on the right. The MPP can
thus be tracked by comparing the instantaneous conductance
(I/V) to the incremental conductance (∆ I/∆ V) [11] as in (1):
- 2013-07-23 17:51:25下载
- 积分:1
-
dianjishiliangkongzhi
基于MATLAB异步电机矢量控制,拿出来与大家分享(MATLAB-based induction motor vector control, and show to share with you)
- 2008-07-22 18:12:38下载
- 积分:1
-
DSP matlab
说明: UCSB 的DSP信号处理8次试验的代码及问题说明word格式(UCSB DSP signal processing eight tests and the code word statement format)
- 2005-11-03 11:11:05下载
- 积分:1
-
2D_Mesh_Generator
Generates 2d triangular mesh
- 2012-06-07 19:15:48下载
- 积分:1
-
ACO-on-JSSP
Dynamic job shop scheduling problem is one form of a job shop scheduling problem with varying arrival time job or not concurrent. This problem can be represented in graph form, which is to seek the shortest path from start point to destination point. One solution that can be used is with the ant colony optimization algorithm. There are three method to input the job : xls file, matriks, and atrractive dialog.
- 2021-01-20 19:08:43下载
- 积分:1