登录
首页 » PDF » article--Analysis-and-Simulation-of-Five-Phase

article--Analysis-and-Simulation-of-Five-Phase

于 2014-10-20 发布 文件大小:193KB
0 265
下载积分: 1 下载次数: 20

代码说明:

  In this paper, a dq model based on transformation theory for five-phase induction machines is presented. A detailed implementation of an indirect-type five-phase field-orientation control including the hysteresis-type pulsewidth modulation (PWM) current regulator is described. A method for continuous and disturbance-free operation of a five-phase field-orientedcontrolled induction motor drive with complete loss of one, two, or even three legs of the inverter or motor phases is described. A complete analysis and computer simulation of this control technique is included.

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • BaitapdienDHcongnghe
    Bai tap dien dai hoc cong nghe
    2009-11-07 10:19:13下载
    积分:1
  • Fouriertransfor_new
    主要实现对图像的二维傅里叶变换,并以一种更加直观的方式显示结果。(Main realization of image 2 d Fourier transform, and in a more intuitive way to show results.)
    2012-04-16 20:56:54下载
    积分:1
  • LMS0
    自适应算法在MATLAB中的实现及参数对性能影响(LMS Algorithm)
    2015-01-02 19:49:05下载
    积分:1
  • matlab
    使用matlab实现三维建模源码,效果非常好,可以用于三维点云数据的建模(Using MATLAB to achieve three-dimensional modeling source code, the effect is very good, can be used for modeling 3D point cloud data )
    2016-10-01 16:48:13下载
    积分:1
  • 004
    说明:  蒙特卡罗马尔科夫链学习相关知识,了解马尔科夫和蒙特卡罗常用方法。(Markov chain Monte Carlo to learn relevant knowledge, understanding common Markov and Monte Carlo methods.)
    2010-03-21 19:49:40下载
    积分:1
  • Time_FFT_PeakFind
    Time_FFT_Peakfind.zip It is a function.
    2012-04-17 19:31:59下载
    积分:1
  • Digital-FilteraEqualizer
    Digital filter 数字滤波器与均衡器(Digital filter digital filter and equalizer)
    2014-10-27 18:50:06下载
    积分:1
  • pmsm
    描述永磁同步电机矢量控制系统控制模型包含clark 变换,park 变换等(PMSM FOC model)
    2013-10-20 20:43:48下载
    积分:1
  • parameter-identified
    系统参数辨识,逆M序列生成输入与输出, 根据输入输出辨识系统参数, 模型可带噪声(parameter identified)
    2013-04-28 22:27:03下载
    积分:1
  • fuhefenpei-matlab
    发电公司一般不允许改变当天的电价投标,但可以改变机组的可用性.因此,在获得发电量之后如何组织机组进行发电,同时,又要保证成本低、效益高、收益大,是每个发电公司需要解决的问题,而行之有效的方法就是动态规划。(Power companies generally are not allowed to change the electricity price bidding, but can change the usability of the unit. Therefore, how to organize the unit after obtaining her capacity to generate power, at the same time, and to ensure that the low cost, high efficiency, large gains, is each generation company needs to solve the problem, and the effective method of dynamic planning.)
    2016-05-18 11:13:13下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载