登录
首页 » PDF » 2

2

于 2014-10-12 发布 文件大小:132KB
0 341
下载积分: 1 下载次数: 0

代码说明:

说明:  new pdf for introfuction of image process

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Computation_of_Line_Parameters
    Computation of line parameters
    2010-12-14 14:43:40下载
    积分:1
  • multiuav5
    说明:  多个无人机的群飞行仿真 多个无人机的群飞行仿真(A number of UAV flight simulation group a number of UAV Flight Simulation Group)
    2008-10-16 19:31:34下载
    积分:1
  • linearmusic
    说明:  经典MUSIC在均匀线阵的情况。本例给出了MUSIC算法估计出的算法图,从图中可以直接看到估计的角度。我们的仿真实验用的是8个阵列,2个接受信号。MUSIC算法的精度很高。(MUSIC classic in the case of uniform linear array. In this case gives the MUSIC algorithm to estimate the algorithm maps directly from the chart to see the estimated angle. Our simulation experiments using 8 arrays, two acceptable signals. MUSIC algorithm for high precision.)
    2008-10-24 16:28:43下载
    积分:1
  • erd
    采用多孔trous算法(undecimated wavelet transform)实现小波变换 (The use of porous trous algorithm (undecimated wavelet transform) the realization of wavelet transform)
    2007-06-07 05:53:28下载
    积分:1
  • changqiangfenxi
    用场强仪采集数据后,可进行场强分布分析,并绘制出场强分布图。(Strength Meter data collection, field intensity distribution analysis, and draw the intensity distribution of the appearance.)
    2013-05-18 22:41:12下载
    积分:1
  • gcc.pdf.tar
    gcc and gnu compilers
    2009-04-16 22:23:49下载
    积分:1
  • NoisenewTVInpaintingTest
    一种基于TV 整体变分算法的图像修复的MATLAB代码(INPAINTING)
    2009-06-25 11:41:59下载
    积分:1
  • flow
    用于电力系统潮流计算的牛顿-拉夫逊法,带3节点和30节点网络算例数据(Power flow calculation )
    2014-12-09 21:21:01下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • DCMotor_nominal
    dc motor nominal simulink
    2011-10-26 01:46:02下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载