登录
首页 » matlab » BG

BG

于 2013-08-12 发布 文件大小:1KB
0 215
下载积分: 1 下载次数: 32

代码说明:

  非线性和非平稳时间序列突变检测的新方法—BG分割算法(Nonlinear and non-stationary time series new method of mutation detection-BG segmentation algorithm)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • 3_34
    专业小程序 撒发生过萨嘎是 萨福哦办法搜ihfpangneo (Professional small programs scattered occurred saga is a way to search ihfpangneo Sappho oh)
    2009-11-16 09:56:45下载
    积分:1
  • motiondetection
    一个实现运动估计的matlab程序 经过测试不错的,推荐给大家(motion detection programed by matlab)
    2010-05-17 13:33:42下载
    积分:1
  • SVD.m
    SVD奇异值变换matlab实现源代码,m文件源代码(SVD singular value transformation matlab source code to achieve, m source code file)
    2016-04-20 19:39:49下载
    积分:1
  • var计算
    说明:  蒙特卡洛,标准历史模拟法计算MATLAB编程计算股票VaR(Monte Carlo, standard historical simulation method to calculate VaR)
    2020-06-12 16:24:50下载
    积分:1
  • LFM-MP-SNR
    稀疏分解在LFM信号模型的应用,稀疏分解应用在低信噪比的情况下,能够很好的恢复原信号(mp—LFM)
    2010-10-12 09:50:19下载
    积分:1
  • randomnum
    一个关于随机数产生的matlab仿真源码程序。(A random number generated on the source code matlab simulation program.)
    2010-10-24 10:07:21下载
    积分:1
  • BPSK
    BPSK的simulink仿真,及其完整的参数设置,频谱分析图和星座图(Simulink simulation of BPSK, and a complete set of parameters, the spectrum and constellation diagram analysis)
    2009-04-27 20:49:55下载
    积分:1
  • gm11
    该代码能使你很方便地运用matlab软件进行灰色预测。(The code allows you to easily use gray prediction matlab software.)
    2009-07-08 18:43:12下载
    积分:1
  • tiaozhi
    以高阶累积量为基础的调制识别,识别ask,psk,qam等调制方式。。(In order cumulants based modulation recognition, recognition ask, psk, qam and other modulation. .)
    2014-09-18 09:26:40下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载