-
FSK16mod2
说明: 绘制星座图的程序,主要要是QAM的仿真,希望大家看看。基于小波的星座图仿真(Constellation diagram drawing program, the main if the QAM simulation, let us look. Wavelet-based Constellation Simulation)
- 2010-04-28 21:41:43下载
- 积分:1
-
cinertia
移动机器人的matlab仿真程序,很好用的,值得学习(Mobile robot matlab simulation program, the good, it is worth learning)
- 2013-09-01 17:01:42下载
- 积分:1
-
visualize-Carbonic-Anhydrase-(CA)-molecule
visualize Carbonic Anhydrase (CA) molecule
- 2013-11-16 12:36:35下载
- 积分:1
-
SolveDelayDiffFuncOEO.m
OEO混沌产生,研究反馈强度对混沌性质的影响(generate OEO chaos to study the influence of feedback strength on chaotic properties)
- 2021-03-25 11:29:14下载
- 积分:1
-
Matlab
说明: matlab实例应用,主要列举了matlab的常用功能,绘图、矩阵运算等等(matlab example application, the main common features listed matlab, graphics, matrix operations, etc.)
- 2011-02-17 09:59:00下载
- 积分:1
-
m_seq
本程序用simulink仿真m序列做扩频码时系统的性能(The procedures used m sequence simulink simulation performance of the system when the spreading codes)
- 2012-04-25 10:55:51下载
- 积分:1
-
LaplaceDisk
solves Laplace equation for a specific B.C. in 2-D on a disk.
- 2011-08-27 22:49:36下载
- 积分:1
-
matlab-
对美国轴承库的采集数据进行分析,通过功率谱等变换判断出是否发生故障,发生什么故障(American Bearing collected data database is analyzed by the power spectrum converting determines whether a fault occurs, a fault occurs it)
- 2013-12-12 11:48:57下载
- 积分:1
-
mcbyq
脉冲变压器设计手册..希望对大家有所帮助(Pulse Transformer Design Manual .. hope to be helpful)
- 2010-07-19 10:36:33下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1