登录
首页 » matlab » 0-annc_slotine

0-annc_slotine

于 2014-08-23 发布 文件大小:8823KB
0 288
下载积分: 1 下载次数: 4

代码说明:

  book number one in control system (automatique)

文件列表:

0-annc_slotine.pdf,9878646,2014-04-14

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Numerical-analysis-with-Matlab
    This tutorial deals with the rootfinding, interpolation, numerical differentiation and integration and numerical solutions of the ordinary differential equations.
    2013-12-07 18:59:37下载
    积分:1
  • Code-FLC-ANFIS-GA-PSO
    We describe in this paper a new hybrid approach for mathematical function optimization combining Particle Swarm Optimization (PSO) and Genetic Algorithms (GAs) using Fuzzy Logic for parameter adaptation and integrate the results. The new evolutionary method combines the advantages of the fuzzy logic to give us an improved FPSO+FGA hybrid method. Fuzzy Logic is used to combine the results of the PSO and GA in the best way possible.
    2016-03-13 18:03:40下载
    积分:1
  • gradiente
    Calculate a gradient by using a mask (sqrt(R² + I² ).(Calculate a gradient by using a mask (sqrt(R² + I² ).)
    2009-09-08 01:59:28下载
    积分:1
  • moxingyuece3
    高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
    2014-01-10 17:30:42下载
    积分:1
  • MODLEACH
    MODLEACH is a protocol developed for wireless sensor networks and is a routing protocol
    2013-12-17 18:49:42下载
    积分:1
  • DSP_MATLAB
    两个正弦信号叠加白噪声 用fft进行频谱分析(failed to translate)
    2011-01-10 17:01:35下载
    积分:1
  • nonlinearmultigridmethodforimageprocess
    非线性多网格方法进行图像处理的程序,采用二重网格法进行图像去噪,中间插值用九点延拓(Non-linear multi-grid method for image processing procedure for the two-grid method for image denoising, in the middle with 9:00 interpolation Extension)
    2010-03-07 20:57:18下载
    积分:1
  • kernel-density-estimation
    说明:  一种核密度估计,或者称作带宽选择的方法,可以估计二维尺度参数,至于多维以上的估计方法尚在开发,多维情况下个人经验好的方法是多次实验取较好值(kernel density estimation, bandwidth selection, two-dimensional scale parameter can be estimated ,for the multi-dimensional approaches are still under development, multi-dimensional cases, personal experience is to do the experiment many times)
    2009-08-06 20:57:37下载
    积分:1
  • correlation
    correlation programs in matlab correlation programs in matlab correlation programs in matlab
    2013-09-28 18:53:27下载
    积分:1
  • NBC
    迁移朴素贝叶斯分类器算法实现,可用于高光谱遥感图像处理(Migration naive Bayes classifier algorithm can be used for hyperspectral remote sensing image processing)
    2015-01-16 16:21:57下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载