登录
首页 » matlab » Aircraft-Stability2

Aircraft-Stability2

于 2012-06-01 发布 文件大小:1KB
0 247
下载积分: 1 下载次数: 4

代码说明:

  it is a stability controller for aircraft with distribution

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • matlab
    Matlab的很多资料,特别适合初学者,是我自己用心整理出来的(Matlab a lot of information, especially for beginners, is sorting out my own heart)
    2010-08-04 10:47:14下载
    积分:1
  • sample
    sample program for wavelet transform
    2011-01-26 00:36:01下载
    积分:1
  • Radar-simulation-and-SAR-imaging
    复杂目标的雷达回波模拟及RD算法SAR成像(Radar echo simulation of complex targets and RD SAR imaging algorithm)
    2014-10-20 12:37:36下载
    积分:1
  • ecgsyn
    MATLAB文件,关于心电信号的采集和处理,不是很全面,谢谢(MATLAB documentation on ECG acquisition and processing, is not very comprehensive, thank you)
    2011-10-28 09:42:36下载
    积分:1
  • How-a-Brushed-DC-Motor-works
    How a Brushed DC Motor works and rotates
    2013-11-14 20:30:26下载
    积分:1
  • MIMO
    比较QR分解算法与迫零算法的误码率,支持BPSK调制和QPSK调制,天线数量可以选择(Compare QR decomposition algorithm and zero forcing algorithm BER)
    2014-02-15 10:19:41下载
    积分:1
  • ch4
    MATLAB科学计算与工程分析源代码源程序3(MATLAB scientific computing and engineering analysis of the source code source 3)
    2009-03-24 11:14:25下载
    积分:1
  • shuxuejianmo_3
    说明:  某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
    2009-07-24 22:58:49下载
    积分:1
  • matlab_ps_tooldem
    MATLAB TOOLBOX FOR PETRI NETS
    2010-11-16 17:28:34下载
    积分:1
  • FastICA_25-1
    Independetn component analysis
    2011-06-05 11:11:00下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载