登录
首页 » matlab » toolbox_fast_marching

toolbox_fast_marching

于 2007-04-12 发布 文件大小:168KB
0 287
下载积分: 1 下载次数: 40

代码说明:

  一个很好的fast marching算法的工具箱,是用matlab语言编写的(a good fast marching algorithm toolbox is the use of the Matlab language)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Edge
    在MATLAB环境下,实现对Lena图像的边缘提取,主要对比了Roberts、Prewitt、Sobel、Laplace四种算子的边缘提取的效果(In the MATLAB environment, to realize the Lena image edge extraction, mainly comparing Roberts, Prewitt, Sobel, Laplace edge detection operator of four results)
    2010-06-08 21:39:52下载
    积分:1
  • model2
    蓄电池容量检测放电模块 ,基于matlab6.5(xu dian chi rong liang jian ce)
    2011-06-30 11:38:56下载
    积分:1
  • 2
    说明:  针对故障诊断,本程序为多工况故障诊断,利用gmm对TE过程实现了故障检测,效果很好(According to the fault diagnosis, the program for fault diagnosis of the condition, TE process to realize fault detection using GMM, the effect is very good)
    2013-01-15 15:24:37下载
    积分:1
  • duffing
    Matlab 语言,杜芬振子相图,位移时间图,混沌展示。(duffing )
    2014-06-08 12:06:33下载
    积分:1
  • DDE-biftool
    这是国外用的研究分岔的完整的M程序,很有用,属再版的(This is a study abroad with a complete bifurcation of M procedures, very useful, is a reprint of)
    2021-01-19 15:18:42下载
    积分:1
  • Juliass2YMDhmsV2
    将距某年开始的总秒数转换为当前的年月日时分秒(The conversion from the total number of seconds in a year to date at the beginning of every minute)
    2014-08-12 12:34:12下载
    积分:1
  • matlab-homework1
    本程序具有打开图片、显示图片和边缘检测等功能,有多种边缘提取算子可供选择(show images and edge detection)
    2014-10-03 17:31:42下载
    积分:1
  • devitrichy
    about IEEE CAN DO THE POSSIBLE STUDIES ON KALMAN
    2013-11-12 18:45:33下载
    积分:1
  • date-calculate
    计算这一年已经逝去的天数(包括当天)。在平年中,它的取值范围为1到365,在闰年中,它的取值范围1到366。编写一个MATLAB程序,输入年,月,日,输出为对应的该天是当年的第几天。 闰年是这样规定的 1).能被400整除的年为闰年 2)能被100整除但不能被400整除的年不为闰年 3).能被4整除但不能被100整除年为闰年 4).其余的年份不为闰年 (This year has calculated the number of days elapsed (including that day). In non-leap year, it ranges from 1 to 365 in a leap year, it s the range of 1 to 366. Write a MATLAB program, enter the year, month, day, corresponding to the output of the first year of the day is a few days. This leap is required 1) is divisible by 400 is a leap year 2) can be divisible by 100 but not divisible by 400 years is not a leap year 3) be divisible by 4 but not divisible by 100 is a leap year 4) the rest of the year is not leap year)
    2011-12-13 23:35:17下载
    积分:1
  • IncludeTest
    Include Test extends Activity Instrumentation Test Case Source Code for Andriod.
    2014-01-17 14:26:18下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载