登录
首页 » matlab » MATLABSOPHOMORE

MATLABSOPHOMORE

于 2012-05-15 发布 文件大小:562KB
0 213
下载积分: 1 下载次数: 2

代码说明:

  Important points for Matlab for beginner

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • distributionTMmode
    本程序计算金属包覆平板波导TM模的光场分布(The program alculates metal-coated flat-panel optical waveguide TM mode field distribution)
    2009-11-06 00:03:10下载
    积分:1
  • eye_example
    MATLAB 中如何画眼图MATLAB 中如何画眼图MATLAB 中如何画眼图(matlab how to draw eyematlab how to draw eyematlab how to draw eyematlab how to draw eye)
    2014-11-17 13:45:37下载
    积分:1
  • one
    MATLAB File for receiver design
    2013-11-29 15:21:54下载
    积分:1
  • toolbox
    Mastering MATLAB Toolbox Reference version 6.0 是英文的,不错的,希望对大家有帮助(Mastering MATLAB Toolbox Reference version 6.0 is English, yes, I hope all of you help)
    2008-04-26 00:10:22下载
    积分:1
  • the-least-square-error-algorithm
    线性分类器-最小平方误差算法,对一组数据进行分类,分析b1、b2改变对结果的影响(Linear classifier- the least square error algorithm)
    2010-05-24 23:09:48下载
    积分:1
  • TimeSeriesLogger
    stability and stabilisation of modelisation of pv and wind and for identification local
    2014-10-09 04:52:48下载
    积分:1
  • Solve_BQME
    Solves matrix equation of type AX+XB+XCX+D = 0 for X being non-square
    2013-10-25 17:48:30下载
    积分:1
  • IMAGZOOM
    matlab图像处理的基本例程,图像放大和缩小(matlab image processing basic routines, image zoom in and out)
    2007-10-30 21:14:02下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 3_rectifier
    three phase model of rectifier. make few changes as per requirement
    2015-04-11 02:08:56下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载