登录
首页 » matlab » power_upfc

power_upfc

于 2012-05-01 发布 文件大小:21KB
0 298
下载积分: 1 下载次数: 119

代码说明:

  ,建立了UPFC在MATLAB平台上的仿 真模型;利用MATLAB建立了三相环形电力系统,将UPFC模型应用到该系统 中,着重研究了UPFC对电网电能质量的影响;研究了UPFC对电网故障中电 压跌落的补偿作用,以及UPFC对正常系统电压的影响。(failed to translate)

文件列表:

power_upfc.mdl,154950,2012-05-01

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • matlab_basic_operations
    Main matlab applications of how to use basic operations
    2009-09-24 22:41:09下载
    积分:1
  • hist_eq
    Image histogram equalization
    2009-03-18 14:14:07下载
    积分:1
  • DetectPIP
    画中画检测,实现了对视频画中画和黑框的检测。(Picture in picture detection. )
    2010-09-25 17:35:27下载
    积分:1
  • Newfolderfour
    it has different programs they are useful
    2010-12-06 06:39:44下载
    积分:1
  • 9927423hough-tuoyuanjiance
    有关椭圆检测的一段小程序 希望大家看看 谢谢支持(Small section of the ellipse detection procedure let us look at)
    2010-05-31 10:45:56下载
    积分:1
  • simplex-matlab(1)
    实现数值分析中单纯形法改进方法的matlab代码,即改进单纯形法算法,能够实现大型稀疏矩阵的迭代,这是3/3..(Numerical analysis to achieve improved method simplex method matlab code that modified simplex method algorithm, to achieve large sparse matrix iteration, which is 3/3)
    2013-09-04 08:34:44下载
    积分:1
  • cz
    说明:  数学建模在的插值问题的求解,主要用于解决测量问题,如水道测量(Mathematical modeling in solving the problem of interpolation, is mainly used to solve measurement problems, such as water measurement Road)
    2009-05-17 19:52:37下载
    积分:1
  • 06901047
    Application of Parallel Redundancy in a Wi-Fibased WNCS using OPNET
    2014-12-22 10:24:50下载
    积分:1
  • clap_filt
    ABOUT SAR INTERFEROMETRY
    2020-09-16 20:07:56下载
    积分:1
  • date-calculate
    计算这一年已经逝去的天数(包括当天)。在平年中,它的取值范围为1到365,在闰年中,它的取值范围1到366。编写一个MATLAB程序,输入年,月,日,输出为对应的该天是当年的第几天。 闰年是这样规定的 1).能被400整除的年为闰年 2)能被100整除但不能被400整除的年不为闰年 3).能被4整除但不能被100整除年为闰年 4).其余的年份不为闰年 (This year has calculated the number of days elapsed (including that day). In non-leap year, it ranges from 1 to 365 in a leap year, it s the range of 1 to 366. Write a MATLAB program, enter the year, month, day, corresponding to the output of the first year of the day is a few days. This leap is required 1) is divisible by 400 is a leap year 2) can be divisible by 100 but not divisible by 400 years is not a leap year 3) be divisible by 4 but not divisible by 100 is a leap year 4) the rest of the year is not leap year)
    2011-12-13 23:35:17下载
    积分:1
  • 696516资源总数
  • 106914会员总数
  • 0今日下载