-
CHAPTER5
说明: 倒立摆 Lqr控制,,有matlab仿真文件(Lqr inverted pendulum control, with matlab simulation file)
- 2011-02-20 20:39:05下载
- 积分:1
-
wydnzl
一个无源滤波器参数自动生成程序,通过matlab运行输入已知参数就能获得RLC参数(A passive filter parameters automatically generated program, enter the known parameters will be able to run through matlab RLC parameters)
- 2012-05-20 22:20:45下载
- 积分:1
-
NLOS
用于基于移动通信系统的室外定位中的非视距传播中的Chan定位算法,泰勒定位算法,以及基站的选取算法。(For outdoor positioning based mobile communications system in the NLOS propagation of Chan location algorithm, Taylor location algorithm, and the algorithm to the base station.)
- 2015-12-02 18:52:55下载
- 积分:1
-
PM_Synchronous_Motor_Drive_Matlab
A matlab tutorial to design PMSM motor speed control systems
- 2013-12-06 14:52:31下载
- 积分:1
-
Huffman
用vs2013写的霍夫曼编码程序,可将.txt中的英文字符串(包括各种字符如:逗号)编码后输出到一个.txt中,并且可输出构建的霍夫曼树,保存编码方式。(Huffman coding using vs2013 to write programs in English can be txt string (including a variety of characters such as: the comma). Encoded output to a txt, and can output to build Huffman tree, save the encoding. .)
- 2014-02-07 15:23:50下载
- 积分:1
-
stl
说明: 实现拉格朗日差值计算的C++程序,结果输入到m文件中用于matlab计算。(Lagrangian difference calculated to achieve C++ program, the results for input to the m file matlab calculations.)
- 2011-04-04 22:30:18下载
- 积分:1
-
3.635.8
在经典波达角估计方法多重信号分类算法中提出了改进(Angle of arrival estimation method in the classical Multiple Signal Classification algorithm in the proposed improvements)
- 2011-11-02 08:45:57下载
- 积分:1
-
model
model maintain the level of water at the pump station
- 2013-11-19 16:37:27下载
- 积分:1
-
matlab80
Matlab 80经典例子,从入门到精通,是初学者的首选(Matlab 80 examples)
- 2013-12-20 06:48:19下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1