-
SC_FDE_LiQingzhong
关于单载波频域均衡的研究,将LMS算法引入SC_FDE系统当中(Equilibrium studies on single-carrier frequency domain, the LMS algorithm is introduced which SC_FDE system)
- 2014-02-24 16:14:25下载
- 积分:1
-
《MATLAB神经网络仿真与应用》源程序
MATLAB关于神经网络的仿真与应用,8个m文件源程序(On the simulation of neural network)
- 2018-04-05 10:06:07下载
- 积分:1
-
vawiggleplot
wiggle plotting the segy format for seismic data set
- 2010-12-01 21:13:55下载
- 积分:1
-
MATLAB---zhuchengfen
matlab中关于主成分分析的一个特经典的程序(matlab on principal component analysis, a special classic procedure)
- 2012-08-16 11:28:12下载
- 积分:1
-
ASIFT
在matlab上的Asift程序,在原有基础上有所改进,程序可以出色地实现图像的识别,匹配,效果相比SIFT,SURF等有大幅提高(In matlab Asift program improvements based on the original, the program can achieve excellent image recognition, matching, compared to the effect of SIFT, SURF, etc. have greatly improved)
- 2013-12-17 12:23:46下载
- 积分:1
-
voiceandMatlab
台湾人写的用matlab读写语音文件的ppt.介绍相当好,适合语音处理的入门文档(Written by Taiwan to use matlab to read and write audio file ppt. Introduce a very good deal for voice entry document)
- 2007-10-09 08:59:15下载
- 积分:1
-
HandbookofMathematicalMATLAB6.0
MATLAB6.0数学手册MATLAB6.0数学手册(MATLAB6.0 Handbook of Mathematical Handbook of Mathematical MATLAB6.0)
- 2009-05-20 11:15:30下载
- 积分:1
-
matlab(cx)
说明: 关于数值计算的matlab程序代码,包含了很多的实用的算法.程序全部可以直接用的,有详细的英文注释.(on numerical calculation of Matlab code, contains a lot of practical algorithm. All the procedures can be directly used, a detailed English Notes.)
- 2006-03-19 21:56:30下载
- 积分:1
-
EMDs
说明: EMD程序包,处理信号的时频分析算法,包含希尔伯特变化程序。(EMD procedure)
- 2010-04-22 19:17:12下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1