-
guicode
matlab 界面编程代码
范例程序很多(matlab interface procedures, many examples of programming code)
- 2007-09-09 21:05:28下载
- 积分:1
-
matlab
里面包含了大量的matlab的应用实例,对初学者来说非常有用(Which contains a large number of matlab application, is very useful for beginners)
- 2007-11-24 13:42:58下载
- 积分:1
-
prony
可以用来识别包装系统的总体参数以及原响应函数的初始相位和振幅(Packaging systems can be used to identify the general parameters as well as the original response function of the initial phase and amplitude)
- 2008-05-27 19:56:33下载
- 积分:1
-
extend_kalman
扩展KALMAN滤波方面的应用,应用于系统跟踪等方面的问题(extended Kalman filter on the application, application tracking systems and other issues)
- 2007-03-01 17:26:28下载
- 积分:1
-
micromeeorology-spectrum
边界层涡度相关资料湍流能谱分析的matlab源代码(Boundary layer vorticity information turbulent energy spectrum analysis matlab source code)
- 2012-05-29 19:41:02下载
- 积分:1
-
ar_tt
与左右手运动想象相关程序,涉及burg算法,功率谱估计(With the left and right hand movement imagination related procedures involving burg algorithm, power spectrum estimates)
- 2012-11-08 17:30:51下载
- 积分:1
-
huiqei
与理论分析结果相比,小波包分析提取振动信号中的特征频率,最小均方误差等算法的MSE的计算。( Compared with the results of theoretical analysis, Wavelet packet analysis to extract vibration signal characteristic frequency, Minimum mean square error MSE calculation algorithm.)
- 2016-09-28 17:35:28下载
- 积分:1
-
Linear_Programming_with_MATLAB
经典的matlab编程代码,这是一部经典的matlab教材,对最优化问题阐述的比较精辟。(the code of matlab,-This is an optimization on the books, is English. This is a classic foreign materials, for optimization problems on the very brilliant)
- 2009-09-10 10:26:03下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1
-
离散迭代
离散迭代,对于离散系统,进行多次迭代,得到最终的准确结果(Discrete iteration)
- 2017-09-23 20:02:42下载
- 积分:1